Some good news from the Irish preservation scene, with the DCDR's O&K No.1 undergoing tests prior to being delivered to the railway. http://www.facebook.com/downrail/posts/334137656684843
Meanwhile in Dublin the RPSI's Beyer Peacock 2-6-0 No.461 is undergoing tests following repairs at Inchicore. She ran light engine from Inchicore to Kildare and back (twice) on Monday, with a loaded test run to Portlaoise and back today, hauling the RPSI BR van and 3 Cravens. She's due to do the same tomorrow.
http://www.steamtrainsireland.com/news/
Meanwhile in Dublin the RPSI's Beyer Peacock 2-6-0 No.461 is undergoing tests following repairs at Inchicore. She ran light engine from Inchicore to Kildare and back (twice) on Monday, with a loaded test run to Portlaoise and back today, hauling the RPSI BR van and 3 Cravens. She's due to do the same tomorrow.
http://www.steamtrainsireland.com/news/