Hope Valley Capacity Scheme updates

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Killingworth

Established Member
Joined
30 May 2018
Messages
4,890
Location
Sheffield
Are the meagre Transpennine services from Sheffield to Manchester Piccadilly via Huddersfield all 2x3 coach 185s? Formations are not showing on RTT (as I'd pretty much expect).

Reports suggest TPE are having difficulty producing route trained crews for the advertised 2 hourly service. However, journey times by substitute coach are 5-10 minutes quicker than the trains diverted via Wakefield and Huddersfield.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
4,890
Location
Sheffield
I guess live there's not much to see. Even a time-lapse wouldn't show very much visible progress.

I didn't have time to take more pictures today but if the weather is kind I'll see what I can do as the week progresses. Here's the work on the new Dore chord/loop about 10.15.

There were a few difficulties reported on TPE diverted services this morning. There still seems to be a shortage of diversionary route signed drivers. As bus replacements may be quicker that may not be such a great disadvantage!

20240316_101834.jpg



20240316_101851.jpg

20240316_101916.jpg
 

Attachments

  • 20240316_101848.jpg
    20240316_101848.jpg
    3.6 MB · Views: 107

ricoblade

Member
Joined
28 Sep 2015
Messages
372
Reports suggest TPE are having difficulty producing route trained crews for the advertised 2 hourly service. However, journey times by substitute coach are 5-10 minutes quicker than the trains diverted via Wakefield and Huddersfield.
Is that one of the ones I saw on Abbeydale Road this lunchtime with “I’m a pretend train, choo, choo” on its indicator?
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
1,716
Location
Greater Manchester
Is that one of the ones I saw on Abbeydale Road this lunchtime with “I’m a pretend train, choo, choo” on its indicator?
Maybe, however there's
1 Bus per 2 hours direct Sheffield - Manchester (TPE busses)
1 Bus per hour direct Sheffield - Stockport (EMR busses)
1 Bus per hour Sheffield - New Mills (Northern)

I'd imagine the TPE bus would stay to motorways and go around near Huddersfield, so I'd imagine you probably saw either the 12:21 EMR bus or the 12:15 Northern bus, not the 12:10 TPE bus (what a good idea, having all 3 busses in the same 11 minutes, they could've at least put the EMR one at the other half hour to the TPE)
 

Killingworth

Established Member
Joined
30 May 2018
Messages
4,890
Location
Sheffield
Is that one of the ones I saw on Abbeydale Road this lunchtime with “I’m a pretend train, choo, choo” on its indicator?
Yes, the Northern choo, choo for New Mills Central! It goes to New Mills New Town, probably because it's easier to wait there and that offers an alternative route into Piccadilly.

The timings of these bus replacements underline why this Hope Valley scheme is so much needed. Double the fast normal train timings. More than double if having to change at Stockport or New Mills.

20240317_151138.jpg

Is that one of the ones I saw on Abbeydale Road this lunchtime with “I’m a pretend train, choo, choo” on its indicator?

Just seen one on Abbeydale Raid inbound to Sheffield saying it was EMR rail replacement, no frivolous choo choo stuff!
 
Last edited:

duffield

Established Member
Joined
31 Jul 2013
Messages
1,360
Location
East Midlands
FWIW, My diverted service from Sheffield to Manchester Piccadilly via Huddersfield today (9B20, 1041 from Sheffield) was very civilised. A 2x3 coach 185, I had a whole 1st class section to myself, and standard class looked pretty empty too. When waiting to leave Sheffield, it was mildly amusing when the announcer claimed that revenue protection would be performing a full ticket check before the train departed - about three minutes before we left! I had visions of some sort of ninja flying down the train scanning a whole row of tickets in a single mid-air pass.

It looked as if the return service from Manchester would be a bit busier, but still far from full. Of course it does take about 40 minutes longer than usual but to me that's a bonus. :E
 

Killingworth

Established Member
Joined
30 May 2018
Messages
4,890
Location
Sheffield
It seems to be going well and flagged as green for commissioning on Monday morning, 25th, with arrival of TPEs 6.14 at Dore.

Final touches going into station today, tarmac being passed across. Still a lot of little details, but 5 full days and nights to get it done.

20240319_160415.jpg

The redoubled tracks south of the station today. The work on the loop/chord is going on out of sight in this view, where 2 orange figures can be seen.

20240319_163420.jpg

The critical spot below Poynton Wood on Sunday afternoon. The old junction has now been removed but the loop/chord still needs completing at this point.

20240317_170955.jpg
 
Last edited:

Mugby

Established Member
Joined
25 Nov 2012
Messages
1,929
Location
Derby
Since it was stated that a retaining wall would be necessary alongside the Dore Loop. has that now become just some concrete pumped into the ground?
 

Killingworth

Established Member
Joined
30 May 2018
Messages
4,890
Location
Sheffield
Since it was stated that a retaining wall would be necessary alongside the Dore Loop. has that now become just some concrete pumped into the ground?

Simply put, it looks like it. It needs an engineer to explain exactly how deep it goes and how it waa formed. It isn't how it was explained it woukd be at the 2016 public inquiry. The Dore loop/chord appears to have been the biggest challenge encountered on the scheme.
 

GardenRail

Member
Joined
26 Mar 2023
Messages
323
Location
Yorkshire
Hope Valley visit today, to see progress. Also visited Earles Sidings to see how we at York ROC will fringe to Earles on the new Sheffield Outer Workstation, live from 25th March. Any interior signal box pictures, taken with permission of the LOM and Duty Signaller.

PXL_20240320_103040517.jpgPXL_20240320_103623197.jpgPXL_20240320_103632243.jpgPXL_20240320_103648576.jpgPXL_20240320_103705565.jpgPXL_20240320_110307726.jpgPXL_20240320_110326251.jpgPXL_20240320_110327608.jpg

PXL_20240320_122219848.jpg
PXL_20240320_122305321.jpg
PXL_20240320_135000776.jpg
PXL_20240320_135023183.jpg
PXL_20240320_140247080.jpg
PXL_20240320_140310027.jpg
PXL_20240320_142226554.jpg
PXL_20240320_142257788.jpg
PXL_20240320_150210120.jpg

PXL_20240320_140347179.jpg
 

Freightmaster

Established Member
Joined
7 Jul 2009
Messages
3,495
Hope Valley visit today, to see progress. Also visited Earles Sidings to see how we at York ROC will fringe to Earles on the new Sheffield Outer Workstation, live from 25th March. Any interior signal box pictures, taken with permission of the LOM and Duty Signaller.View attachment 154581

Glad to see a shiny new diagram has been provided at Earles Sidings rather than the usual method of gaffer taping a sheet
of A4 paper over the old one! :lol:




MARK
 

DDB

Member
Joined
11 Sep 2011
Messages
485
Am I interperting the diagram correctly that the change over of control to York happens part way down the loop?
Is that normal for one box/panel to control the entrance to a loop and a different one control the exit?
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,221
Major progress since Sunday's pictures with all track in final places.
 

GardenRail

Member
Joined
26 Mar 2023
Messages
323
Location
Yorkshire
Am I interperting the diagram correctly that the change over of control to York happens part way down the loop?
Is that normal for one box/panel to control the entrance to a loop and a different one control the exit?
No, it just shows our first signal which is the entrance into to loop. Just so that Earles can see what's going on. The loop is fully York ROC Sheffield Outer.
 

midland1

Member
Joined
18 Aug 2019
Messages
298
Location
wigston
Am I interperting the diagram correctly that the change over of control to York happens part way down the loop?
Is that normal for one box/panel to control the entrance to a loop and a different one control the exit?
Used to be very common, still in use at Langham Jn. to Oakham on Syston to Peterborogh.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
6,129
Location
Surrey
Hope Valley visit today, to see progress. Also visited Earles Sidings to see how we at York ROC will fringe to Earles on the new Sheffield Outer Workstation, live from 25th March. Any interior signal box pictures, taken with permission of the LOM and Duty Signaller.

View attachment 154580View attachment 154581View attachment 154582View attachment 154583View attachment 154584View attachment 154585View attachment 154586View attachment 154587

View attachment 154588
View attachment 154589
View attachment 154590
View attachment 154591
View attachment 154592
View attachment 154593
View attachment 154594
View attachment 154595
View attachment 154596

View attachment 154597
Great set of pictures sir
 

Killingworth

Established Member
Joined
30 May 2018
Messages
4,890
Location
Sheffield
Hope Valley visit today, to see progress. Also visited Earles Sidings to see how we at York ROC will fringe to Earles on the new Sheffield Outer Workstation, live from 25th March. Any interior signal box pictures, taken with permission of the LOM and Duty Signaller.

View attachment 154580View attachment 154581View attachment 154582View attachment 154583View attachment 154584View attachment 154585View attachment 154586View attachment 154587

View attachment 154588
View attachment 154589
View attachment 154590
View attachment 154591
View attachment 154592
View attachment 154593
View attachment 154594
View attachment 154595
View attachment 154596

View attachment 154597
An excellent photographic summary of progress - I'm envious of the access obtained to so many locations. Completion of track round the Dore curve has been bogged down for some time!
 

GardenRail

Member
Joined
26 Mar 2023
Messages
323
Location
Yorkshire
Below is the view from the compound in the triangle, and the new signal at Bamford for the new loop, which has flashing aspects in rear of it for a faster entry into the loop, rather than approach control.
rsz_1pxl_20240320_135006331.jpgPXL_20240320_114504607.jpg
 

Killingworth

Established Member
Joined
30 May 2018
Messages
4,890
Location
Sheffield
Below is the view from the compound in the triangle, and the new signal at Bamford for the new loop, which has flashing aspects in rear of it for a faster entry into the loop, rather than approach control.
View attachment 154617View attachment 154618
First picture shows remains of the pond/swamp that was bedevilling construction round the curve. It's still very wet down there.
 

WesternBiker

Member
Joined
26 Aug 2020
Messages
606
Location
Farnborough
An excellent photographic summary of progress - I'm envious of the access obtained to so many locations. Completion of track round the Dore curve has been bogged down for some time!
Indeed - and great to see it all coming together. But thanks are due to you as well, for your series of photographic updates over the project.

Separately, does anyone know if they’re going to take advantage of the possession to cut back any of the vegetation that seems to be encroaching along the key cuttings? Looks like it could be really bad for leaf fall, come the autumn.
 