Intercity 225 to Newcastle?

Status
Not open for further replies.

omnicity4659

Member
Joined
25 Sep 2017
Messages
193
Given that IC225s spent 30-odd years running from Edinburgh, why would they need test runs if they were to operate from Newcastle? Surely the performance is still well understood, and the infrastructure can't have changed that dramatically in the last three or four years?
It’s not about the performance of the sets, the sets have been fitted with additional equipment to assess the OHLE.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
5,276
Given that IC225s spent 30-odd years running from Edinburgh, why would they need test runs if they were to operate from Newcastle? Surely the performance is still well understood, and the infrastructure can't have changed that dramatically in the last three or four years?
4 x Mk4s have been fitted with infrastructure monitoring equipment funded by Network Rail.
The test run is on behalf of Network Rail I am lead to believe.

Edit: Tweet attached from LNER Head of Performance:-


Our IC225 test train passes through York before arriving in Newcastle alongside some other former @LNER heritage traction! This trip was arranged with @NetworkRailEC to allow engineers to gain more insights into OLE condition using the Pandas V system fitted to 91127 @225groupuk
 

Indigo Soup

Established Member
Joined
17 May 2018
Messages
1,404
It’s not about the performance of the sets, the sets have been fitted with additional equipment to assess the OHLE.
4 x Mk4s have been fitted with infrastructure monitoring equipment funded by Network Rail.
That was in the context of 'if the test run(s) were with a view to running passenger service' - for which it's difficult to see why any testing would be required.
 