• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Isle of Man Steam Packet Co

childwallblues

Established Member
Joined
3 Jul 2014
Messages
2,867
Location
Liverpool, UK
Fast Craft Mannaman which is currently in the Wet Basin at Cammell Lairds, Birkenhead will leave on Tuesday at 1100 hours. She will cross over the river to the new Isle of Man Ferry Terminal in Liverpool to undertake berthing trials. Mannaman is due to start using the terminal when thr ferry service to Douglas resumes at the end of the month.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
13,305
Location
Isle of Man
It won’t be using the new terminal for a while yet. The government have told us ‘spring 2024’ but haven’t been more committal than that. And given the extended delays due to the government’s incompetence, I’d not expect to see it in use until well after TT.
 

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,141
They need to get it operational ASAP..........
Manxman has had a torrid time recently with lost sailings due to tech issues - AFAIK it lost four days last week, with several in previous weeks. Good job they haven't got rid of the Ben yet

Is the old Pier Head landing stage still available or has that gone?
 

Polarbear

Established Member
Joined
24 May 2008
Messages
1,705
Location
Birkenhead
The Pier Head landing stage does appear to be available still. From what I can observe, the new terminal at Liverpool seems to be largely complete, but no obvious sign of any imminent change to the berth location.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
13,305
Location
Isle of Man
The old linkspan at Pier Head is still there and can still be used until the new terminal is ready to open.

Manxman didn’t lose four days last week, but it has had intermittent technical problems. Or at least the Steam Packet say they are technical problems. There’s a lot of cynicism here given the industrial relations issues and given the Manxman’s size and issues with wind at Heysham. It’s a shame, it’s really is a fabulous ferry.

The Ben apparently isn’t operational. Well it is, but it is limited to 7 knots. Or so the rumour mill claims.
 

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,141
The old linkspan at Pier Head is still there and can still be used until the new terminal is ready to open.

Manxman didn’t lose four days last week, but it has had intermittent technical problems. Or at least the Steam Packet say they are technical problems. There’s a lot of cynicism here given the industrial relations issues and given the Manxman’s size and issues with wind at Heysham. It’s a shame, it’s really is a fabulous ferry.

The Ben apparently isn’t operational. Well it is, but it is limited to 7 knots. Or so the rumour mill claims.
I can see Arrow being lined up to take the bikes during the TT...........

You'd have thought they would have remembered the Heysham wind problems after all the scrapes bangs and crashes with Mona's Isle (ex Free Enterprise III). I know it's going back a few years, but surely someone must still be around from then who could have flagged the problem? That came to a head with it being beached on Overton sands after being forced to go backwards to avoid ramming the harbour entrance due to wind........while Manx Viking just carried on as normal

As for the "lost four days", the SteamPacket announced it was going to happen, presumably they changed their minds

Talking of Manannan, was the broken diesel ever repaired/replaced or is it still just running on three?
 
Last edited:

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
13,305
Location
Isle of Man
Arrow can only take 12 passengers, so it’s no use to the bikes. Useful to fill with trucks to let the other ferries take the bikes though.

I believe they were fixing the fourth engine whilst it was in dry dock. But I’m sure we’ll see in due course.
 

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,141
Arrow can only take 12 passengers, so it’s no use to the bikes. Useful to fill with trucks to let the other ferries take the bikes though.

I believe they were fixing the fourth engine whilst it was in dry dock. But I’m sure we’ll see in due course.
They used one of the freighters once when they had problems before. Shipped the bikes from Heysham on the freighter, then bussed the passengers to Stranraer and used one of the Calmac ships to get them to Douglas. Logistical nightmare

==edit==
thinking more about that, it was after Manx Viking had gone and the only ro-ro ferries they had were Tynwald and Peveril.
One of the two sideloaders got stuffed into a harbour wall, and Liverpool didn't have a linkspan - just a floating pontoon for the sideloaders.
So the bikers had to ride from Liverpool to Heysham, put their bikes there onto Peveril, get a bus to Stranraer and then get onto Calmac's Clansman at 12knots to Douglas.........and then collect their bikes off Peveril
 
Last edited:

chiltern trev

Member
Joined
28 Mar 2011
Messages
392
Location
near Carlisle
The old linkspan at Pier Head is still there and can still be used until the new terminal is ready to open.

Manxman didn’t lose four days last week, but it has had intermittent technical problems. Or at least the Steam Packet say they are technical problems. There’s a lot of cynicism here given the industrial relations issues and given the Manxman’s size and issues with wind at Heysham. It’s a shame, it’s really is a fabulous ferry.

The Ben apparently isn’t operational. Well it is, but it is limited to 7 knots. Or so the rumour mill claims.
Manxman did not lose 4 days last week.

There are 4 days planned maintenance for the evacuation system and the Ben My Chree is to stand in on the said dates. The 4 days are spread over several months and are not in one block.

Here is the article on 4 days. https://www.bbc.co.uk/news/articles...eduled to be,Chree, or the fastcraft Manannan

Flagship passenger ferry Manxman will be taken out of action on four occasions for "planned servicing" of its marine evacuation system.

Work is scheduled to be carried out on the system on 26 March, 15 and 25 April, and 7 May, the Isle of Man Steam Packet Company has said.

The vessel will be replaced on its scheduled passenger journeys by either its predecessor, the Ben-my-Chree, or the fastcraft Manannan.

The testing of the evacuation system involves deploying chutes and detachable survival rafts for emergency situations.

The Ben-my-Chree itself is also due to have its planned annual maintenance and inspection during the months of March and April.

A spokesman for the ferry firm said its reservations team would confirm changes in travel information during the period with passengers via email or phone where appropriate.

The Manannan, which to come back into service to carry out journeys to Liverool at the end of the month, has also been given an overhaul and cabin refit during the winter period, he added.

Go to Mr Drone on YouTube. This week's video is of the Manannan testing and using the new Liverpool terminal and linkspan which looks to be successful
 
Last edited:

Top