Thornaby 37
Member
Mods please feel free to move if this has been posted in the wrong forum
According to the Branch Line Society and confirmed on RTT, a London Overground class 378 is due to make a test run from Crystal Palace to London Bridge this Sunday 25/02/2024, arriving at 10:34 and departing at 10:54
This is in conjunction with engineering works taking place on Easter Sunday, when London Overground will be running a half hourly shuttle between West Croydon and London Bridge [timings of which are also on RTT}
It did make me wonder, will this be the first time London Bridge is served by London Overground, also why Southern aren't running this service ?
According to the Branch Line Society and confirmed on RTT, a London Overground class 378 is due to make a test run from Crystal Palace to London Bridge this Sunday 25/02/2024, arriving at 10:34 and departing at 10:54
This is in conjunction with engineering works taking place on Easter Sunday, when London Overground will be running a half hourly shuttle between West Croydon and London Bridge [timings of which are also on RTT}
It did make me wonder, will this be the first time London Bridge is served by London Overground, also why Southern aren't running this service ?