Network Rail submits plans for station at Kincardine

Status
Not open for further replies.

och aye

Member
Joined
21 Jan 2012
Messages
802
The title in the article is a bit click-baity, as it transpires it is a request for an Environmental Impact Assessment, Network Rail have acutaly submitted.


THE RE-OPENING of a rail line between Alloa and Longannet could be a step closer with the submission of a planning application.


Network Rail have submitted a request for an Environmental Impact Assessment for a proposed railway station and ancillary development at land to the south of Broomknowe, Kincardine.


This could mean hopes for a long-awaited link between Dunfermline and Alloa could be on track.
A Network Rail spokesperson said: "We are currently looking at a range of options for enhancing the line between Alloa and Longannet."
Back in September last year, Network Rail announced that they were to start the "next phase" of development work between Alloa and Longannet which could see the reinstatement of passenger services between Clackmannanshire and Fife.
They said that engineers would be carrying out survey work and site and geological investigations to gain information for the project which could enhance and electrify the former freight line and see the introduction of three new stations at Clackmannan, Kincardine and Longannet.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joshua483

On Moderation
Joined
4 Apr 2021
Messages
70
Location
Wokingham

och aye

Member
Joined
21 Jan 2012
Messages
802
Is the long term idea for a direct Dunfermline to Glasgow electrified route?
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,414
Location
Salt & Vinegar
I’d like to see them consider the case for a station at Cambus while they’re looking at an extension.

My understanding is that there was a decent business case for serving Cambus / Tullibody but the dwell time at Alloa couldn’t support 2 extra stops.

Once you’re extending to Kincardine that calculation becomes different.
 