Norwood Junction - New roof for Platform 6

Status
Not open for further replies.

Railcar

Member
Joined
27 Nov 2017
Messages
228
Last week, a team of men were attaching corrugated plastic sheeting to form a roof for Platform 6 at Norwood Junction. This platform has an exit to Clifford Road and is furthest from the ticket office. Platforms 4 and 5 handle the busy suburban traffic (Southern and Overground), with platform 3 (Down Main) used by the Thameslink stoppers.
If platform 6 is to be brought back into use will it be for the suburban services (and popular for commuters living in Woodside)?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,189
Last week, a team of men were attaching corrugated plastic sheeting to form a roof for Platform 6 at Norwood Junction. This platform has an exit to Clifford Road and is furthest from the ticket office. Platforms 4 and 5 handle the busy suburban traffic (Southern and Overground), with platform 3 (Down Main) used by the Thameslink stoppers.
If platform 6 is to be brought back into use will it be for the suburban services (and popular for commuters living in Woodside)?

Platform 6 at Norwood Junction is in constant use, however platform 7 on the other side of the island platform has been out of use for well over 40 years.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,246
Location
Wittersham Kent
Platform 6 at Norwood Junction is in constant use, however platform 7 on the other side of the island platform has been out of use for well over 40 years.
Wasn't platform 7 for services over the Norwood Spur Junction to Beckenham? I don't think it was ever electrified and has probably been out of use for closer to 100 years. I think the track was left in place because it was used by coal traffic to Norwood yard until the early 1970s.
 

Railcar

Member
Joined
27 Nov 2017
Messages
228
My mistake. I looked yesterday. It is the roof over platform 8 that is being replaced (there is still a gap at the country end). The track approaching the platform is overgrown with weeds and shrubbery and it becomes a siding, ending in a bufferstop.
Since NR would hardly spend capital on a disused platform accessed by a useless track (no third rail), can we presume that the work on platform 8 is preparation for the changes to Windmill Bridge Junction and East Croydon station?
 

Peregrine 4903

Established Member
Joined
18 Aug 2019
Messages
1,456
Location
London
My mistake. I looked yesterday. It is the roof over platform 8 that is being replaced (there is still a gap at the country end). The track approaching the platform is overgrown with weeds and shrubbery and it becomes a siding, ending in a bufferstop.
Since NR would hardly spend capital on a disused platform accessed by a useless track (no third rail), can we presume that the work on platform 8 is preparation for the changes to Windmill Bridge Junction and East Croydon station?
Do you mean Platform 7?

Don't think Platform 8 at Norwood Junction has ever existed.
 

Railcar

Member
Joined
27 Nov 2017
Messages
228
Do you mean Platform 7?

Don't think Platform 8 at Norwood Junction has ever existed.
Platform 7 (although it has no signs) forms an island wih Platform 6. The building accessed from Clifford Road, with a platform facing the overgrown track, is being re-roofed. The numbering sequence would make that Platform 8
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,189
Platform 7 (although it has no signs) forms an island wih Platform 6. The building accessed from Clifford Road, with a platform facing the overgrown track, is being re-roofed. The numbering sequence would make that Platform 8

We don’t have a platform 8 at Norwood Junction.
 

Attachments

  • IMG_6514.png
    IMG_6514.png
    284.9 KB · Views: 46

PGAT

Established Member
Joined
13 Apr 2022
Messages
1,469
Location
Selhurst
It's another one of those projects that's been forgotten about/scrapped because of COVID
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,189
.
Since NR would hardly spend capital on a disused platform accessed by a useless track (no third rail), can we presume that the work on platform 8 is preparation for the changes to Windmill Bridge Junction and East Croydon station?

The talk at work is that the CARS project has been scrapped indefinitely, especially as the current train service and train lengths don’t warrant it anymore.
 