Railcar
Member
- Joined
- 27 Nov 2017
- Messages
- 229
This morning (Tues 28th Nov) as my Eastbourne-bound train stopped at Berwick, as well as Glynde, I sked the OBS "why the unusual stopping pattern?" She told me that faulty points at Eastbourne were preventing a full service to be run. We pulled into EBN Platform 2 with EBN Pl.3 empty, It would seem that it is the points to access Pl.3 that are faulty.
Troubles on the Brighton Line this afternoon, with delays 'due to a fault with the signalling system' meaning that Victoria fasts were being pathed to East Croydon Platfom 4, rather than 1.
Troubles on the Brighton Line this afternoon, with delays 'due to a fault with the signalling system' meaning that Victoria fasts were being pathed to East Croydon Platfom 4, rather than 1.