Redouble Aberdeen-Keith Junction?

MadMac

Member
Joined
13 Jun 2008
Messages
969
Location
Moorpark, CA
Don’t know if this has been discussed before - in recent years, this line has been redoubled from Dyce-Inverurie. Insch-Kennethmont remained double when the remainder was singled in 1968 (?) - is there an argument for going back to the position then?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Puddock

Member
Joined
10 Jan 2023
Messages
394
Location
Frog
Inverurie to Insch redoubling was supposed to be the next phase of the A2I project after the Berryden to Inverurie redoubling but they ran out of money then Covid intervened. From Inverurie to Keith the double track solum and earthworks are still complete, there is only one major structure (Deveron Viaduct) which was extensively refurbished and strengthened in summer 2023, and the minor over and under bridges are all still configured for double track. You’d need to do something with Oyne and Gartly AHB crossings as these both date from 1973 but are due for renewal at some point in CP7 anyway. You could argue all day whether the signalling between Aberdeen and Elgin would be better recontrolled to a new workstation in Aberdeen or if the Highland workstation in Inverness could cope with the increase.

However, the line is geographically distant from the Central Belt and to date the Scottish Government has shown little interest in the needs and aspirations of the north of Scotland. There is also the ongoing saga of the (non) dualling of the A96 road between Inverurie and Inverness, which looks to be going the same way as the A9 ill-fated dualling project. There is also the fact that the Scottish Government is skint and the offical appetite for infrastructure investment - let alone enhancement - is likely to be minimal over the next decade.

In short - don’t hold your breath.
 
Joined
2 Jan 2009
Messages
517
Inverurie to Insch redoubling was supposed to be the next phase of the A2I project after the Berryden to Inverurie redoubling but they ran out of money then Covid intervened. From Inverurie to Keith the double track solum is complete, there are no major structures or earthworks and the bridges that do exist are all still configured for double track. You’d need to do something with Oyne and Gartly AHB crossings as these both date from 1973 but are due for renewal at some point in CP7 anyway.

However, the line is geographically distant from the Central Belt and to date the Scottish Government has shown little interest in the needs and aspirations of the north of Scotland. There is also the ongoing saga of the (non) dualling of the A96 road between Inverurie and Inverness, which looks to be going the same way as the A9 ill-fated dualling project. There is also the fact that the Scottish Government is skint and the offical appetite for infrastructure investment - let alone enhancement - is likely to be minimal over the next decade.

In short - don’t hold your breath.
Related to this project is the growing campaign to reopen the railway to Fraserburgh and Peterhead. Additional capacity is needed immediately north of Aberdeen station and there are a couple of options to be able to add a 2nd track in through the tunnels.
 

lachlan

Member
Joined
11 Aug 2019
Messages
798
The aim was for an hourly service between Aberdeen and Inverness and end-to-end journey times of 2 hours by 2030 (the current quickest journeys seem to be around 2hr11). I don't know if there was further dualling planned to achieve this.
 