As others have said it depends on depot, route, distance from sign on point to revenue equipment collection, type of train worked etc. For instance at my depot if you're working a local train you get 20 minutes before departure, if it's an Intercity you get 22, as there is more work to be done to prepare an Intercity for departure than a local.