william.martin
On Moderation
Who's idea was it for these trains not to tilt???Let's out this one to bed! A Pendolino's top end acceleration from 90mph is quicker than a class 800/802. But an 805/807 will always lose time having to brake for lower speeds and accelerating back up to 125mph - where the Pendolino can sail through at full speed. That's why the non tilt schedule for Class 805/ 807 is appx 7 minutes slower net timings than the Pendolino schedule from Euston to Crewe.
On the simulator, 30.5 mins Euston to Milton Keynes is achieved following a hybrid speed profile (EPS as existing except for reductions to 100mph at Berkhamsted and 90mph nirth of Leighton Buzzard
I think Hitachi need to go back to the drawing board and get a tilting mechanism sorted. (Obviously it will not happen)