The six week delay cannot be recovered, unless a vast amount of additional testing and driver training commences, which is almost impossibleThe current 6 week slippage is just as likely to be recovered
I was surprised to learn that 105 is still at Kingmoor since 25 September 2010
The only suggestion has been to increase runs to include Saturday and Sunday nights, and even then the clawback would only be about 2 weeks (10 days out of 5 weekends)
The information I had was that 380105 had been collected by a Class 67 and moved back to Polmadie for inspection
After inspection it had then been moved again so that repairs could be effected (away from OHLE)