Understand that all bar the peak Bedwyns are going to be shuttles from Newbury from May. Reason given is (aside from 10% cost reduction from DfT) that trains need replacing in South West so the IETs used on Bedwyns are being shifted and we're back solely on 165s.
Most Bedwyns have been shuttles since the Hitachi cracks surfaced, and reliability and connections have suffered as a result.
Service has gone from best ever timetable pre Covid to this, which is arguably worst since 1992. I know this is hardly unique.
Most Bedwyns have been shuttles since the Hitachi cracks surfaced, and reliability and connections have suffered as a result.
Service has gone from best ever timetable pre Covid to this, which is arguably worst since 1992. I know this is hardly unique.