D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 12,278
Hitachis class 8xx are the most expensive trains in the UK but that didn't stop them being revealed with fundamental problems thats going to take years to fully resolve.
The core issue here is we should have just settled on one design got it right and mass produced them rather than letting each operator do its own thing specifying what it wants.
It’s a nice thought, but surely one that isn’t ever going to be feasible. Look at how many different Class 19x, 7xx, 8xx variants are being turned out. Too many small quantities and incremental tweaking.Your own example hinders your argument - how could one design have satisfied the needs of the Hitachi 8xx and CAF 19x orders? They were built to serve very different markets.