I can understand that. Blaming an innocent trampoline could rebound on them!There has to be independent verification before they announce this as a reason. They don’t want to jump to conclusions!
Always good to bounce ideas off someone else.I can understand that. Blaming an innocent trampoline could rebound on them!
My sons on an XC from Newcastle to York, delayed 15 mins at Darlo. According to NRE it’s due to “the train being cleaned specially”, but according to the conductor it’s because some oily bags got wedged between the wheel and the brakes and caught fire.
Northern have been giving out that excuse/reason for well over six months. When does an "unusual" situation become the "usual" situation ?
The code (OC) at the end is actually much more use than this message is...https://www.realtimetrains.co.uk/train/Y75106/2020-02-13/detailed
This service was cancelled due to an error having been made.
Northern olr has a new excuse. When no train. ie more trains than usual needing repair or being replaced by a slower train. Has been replaced by wait for it. New excuse. due to the train being specially cleaned. Amazing excuse don't you think, what a new excuse to come up with especially as the cleaning off trains is high on northerns olr agenda. Why not use this one and get away with it as well. Especially as when there is no unit available. And you can lie to the public and passengers in making them believe that your serious in train cleaning and backing it up by the other missionary,statement off theirs things will not improve overnight. amazing the train being specialist cleaned.
There was one yesterday where the train didn't even come off Depot. And services cancelled throughout as wellI think that means a passenger has vomited or worse?
There was one yesterday where the train didn't even come off Depot. And services cancelled throughout as well
Extensive graffiti in hard to remove paint?
Northern olr has a new excuse. When no train. ie more trains than usual needing repair or being replaced by a slower train. Has been replaced by wait for it. New excuse. due to the train being specially cleaned. Amazing excuse don't you think, what a new excuse to come up with especially as the cleaning off trains is high on northerns olr agenda. Why not use this one and get away with it as well. Especially as when there is no unit available. And you can lie to the public and passengers in making them believe that your serious in train cleaning and backing it up by the other missionary,statement off theirs things will not improve overnight. amazing the train being specialist cleaned.
I find semi regularly that a problem currently under investigation reminds that and is never updated! I only know how many TOCs do this but SWR definitely do.Remember that the wording you see on real time trains is their wording for each delay code.
Whilst VE may literally mean 'fare evaders' under the Delay Attribution Guide, delay attribution is to root cause. It could have been staff assault when fare vaders were challenged for tickets, for example.
Also delay codes often get updated when more information comes available or someone with more time can look into it and amends it to something that is more accurate.
I find semi regularly that a problem currently under investigation reminds that and is never updated! I only know how many TOCs do this but SWR definitely do.
Today the 7:06 arrival from London Bridge to Guildford and the 7:12 departure to London Bridge were terminated and started short at Effingham Junction. These are Southern branded services. At no time they update to the problem under investigation reason on National Rail Enquiries.
The 7:04 arrival, ahead of if, into Guildford was running 3 to 4 minutes late and that must be the reason for the change. I say this as other times it's late they provide a late trian running in front reason.
I quite agree but for every late running train in front of a delayed train or congestion, someone must also be currently investigating a problem.This is the difference between delay attribution and public facing delay reasons. If the information is relying on the delay attribution code, then this goes to root cause. The true question is why is this the train in front of it late, and that could well be a problem that is still under investigation.
Heard this at Wigan North western and both Manchester victoria and Piccadilly today 'this service has been cancelled due to an unusual large number of trains being away for repair,Monday the 09th march 2020 the last northern rail service from Leeds to Manchester Victoria was cancelled. However on realtime trains it is showing cancelled due to a problem with the schedule. Another interesting example off a excuse
It's just not on . Last week the only 4 available. 142s we all in use. This week 2 spare at newton Heath T.M.D doing nothing. Put them on rose Hill or anywhere and it means more trains can. Run. About Time at least to may. The Tory politicians swallow a bit off pride. And realise with olr Pacers can actually achieve them. Some better performance right away from day one. What is different this week compared to last. I just don't understand why. At times.Heard this at Wigan North western and both Manchester victoria and Piccadilly today 'this service has been cancelled due to an unusual large number of trains being away for repair,
What was unusual was the the fact it was 3 different rail companies . An avanti London Blackpool train a transpennine service and a northern service.Heard this at Wigan North western and both Manchester victoria and Piccadilly today 'this service has been cancelled due to an unusual large number of trains being away for repair,
EMR cancelled a service last week "due to a flea infestation" in the cab.
Seemingly imported from Greater Anglia...Oh dear, which driver brought those in?
Oi! Hop it!