What are some examples of changes being planned for by either the TOCs, Network Rail or both, either imminently, at the December timetable change or beyond into 2024?
These could include new or old services or rolling stock being introduced or withdrawn, or moving to a different operator, or currently separate operators being merged into a single undertaking (Northern and TPE…) or alternatively changes to service frequencies or rolling stock allocations, or services being diverted due to either the aforementioned reasons, or infrastructure intervention including platform lengthening, new electrification being energised, or upcoming engineering works.
I am looking for where the railways are actually going in the short term, regardless of the situation with the current government and industrial relations, of which I am too aware.
These could include new or old services or rolling stock being introduced or withdrawn, or moving to a different operator, or currently separate operators being merged into a single undertaking (Northern and TPE…) or alternatively changes to service frequencies or rolling stock allocations, or services being diverted due to either the aforementioned reasons, or infrastructure intervention including platform lengthening, new electrification being energised, or upcoming engineering works.
I am looking for where the railways are actually going in the short term, regardless of the situation with the current government and industrial relations, of which I am too aware.