Justin Smith
Established Member
I have been reading the very interesting article in the Railway Magazine about the construction of the Selby diversion (apparently the design team were specifically told at the time to "forget [about] electrification ! ) which was opened 40 years ago.
The one thing I kept wondering was would they have built the diversion if they'd known the coalfield would only be in use for about 20 years ?
The one thing I kept wondering was would they have built the diversion if they'd known the coalfield would only be in use for about 20 years ?