hi everyone
its my first post on here so hello,just a question on how easy or costly do you think it would be to install doo on different networks,would it be for instance easy on merseyrail and difficult on say arriva wales,i have a vested intrest as im a conductor but without getting into all the polotics of the matter how long in your opinions does the grade have left.
would new stock be needed,station upgrades be done etc.
its my first post on here so hello,just a question on how easy or costly do you think it would be to install doo on different networks,would it be for instance easy on merseyrail and difficult on say arriva wales,i have a vested intrest as im a conductor but without getting into all the polotics of the matter how long in your opinions does the grade have left.
would new stock be needed,station upgrades be done etc.