MCR247
Established Member
- Joined
- 7 Nov 2008
- Messages
- 9,993
Testing out of service
S7+1 21319+21320 running on the MET today.
What's an S7+1? Is that just an S7 with an extra car coupled on to the end?
Option B. S7 with another S7 carriage and everyone travels like a crab - sideways!
No, they've just borrowed a carriage from another unit. There will be three of them in total. It's a temporary thing to cover the 37 S8s that are going back to Derby ( not all at once! ) to have their wiring looms replaced.
Bombardier. That's whats up with them.
Yes, I knew that much, but what specifically regarding Derby's build quality is up with them?
Software upgrades (or lack thereof), electrical problems and bogie-related issues, if I remember correctly...
Modern Railways said its in part the wiring isn't up to standards for new signalling plus bogie issues.
But hang on, Isnt the new signalling also Bombardier Produced? You'd think that even considering to make their trains compatable with their own signalling (let alone standard signalling) would be on their design / build list but obviously not...
If you remember the re-signalling contract was relet last year (2011) after the original contract was cancelled. It is most likely that the problems with the wiring on the trains is due to the substitution of a completely different signalling system from that specified when the S stock was ordered.
The Engineer
Bombardier to upgrade the signalling on four Tube lines
16 June 2011
Share
Comment
Save
.
London Underground has awarded Bombardier Transportation a contract valued at approximately £354m to upgrade the signalling on the Circle, District, Hammersmith and City and Metropolitan lines.
Alongside a fleet of 191 new air-conditioned walk-through trains already being rolled out on the Metropolitan line, the new signalling system will enable passengers to travel more quickly and frequently on all of the subsurface lines, which together make up 40 per cent of the Tube network.
Overall, the upgrade, which is due for completion in 2018, will provide 24 per cent more capacity on the District line, 27 per cent more capacity on the Metropolitan line and 65 per cent more capacity on the Circle and Hammersmith and City lines.
.
London Underground has been working with and learning from other metros around the world in order to identify innovative ways to upgrade the Tube while minimising disruption.
As a result, Bombardier Transportation, which recently upgraded the signalling on the Madrid Metro, has committed to installing and testing its CITYFLO 650 automatic train control signalling system without any need for weekend closures.
There will still be a need for weekend closures to upgrade track and platforms, but these will not be the full line closures that have been experienced during previous upgrade work on other lines under the public-private partnership (PPP).
Mike Brown, London Underground’s managing director, said: ‘This is a major step forward in our plan to upgrade the Tube and will mean faster, more frequent and reliable Tube services across 40 per cent of the Tube network.
‘We know that line closures are disruptive to our customers and, as a result, we have insisted on the delivery of the new signalling system without the need for the kind of closures we have seen on other lines.
Read more: http://www.theengineer.co.uk/sector...four-tube-lines/1009035.article#ixzz2BrO311Y3
I thought it was going to be relet but wasnt? Certainly all the articles around the internet i can find lead to one and only one certain mainufacturer. Yes, Dear Old Bombardier again - The Bombardier CityFlo 650 System. If this is the case, then it's just as well their not producing the Thameslink ATO trains then.
S7+1 21323/24 in service on the MET yesterday.
In fact at 17:07 NB ex-Baker St. T455 UXB 21323/24 followed T463 WFD 21319/20 !
And to think I missed that when I could quite easily have gone to have a look
But... just to clarify, was this at Baker Street or somewhere else?
S7 21313/14 successfully completed an empty test run to Barking and back, after the morning peak today, getting things ready for the start of passenger workings on Sunday.