Thameslink/ Class 700 Progress

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,506
Location
UK
Errrrrr.. One of our Drivers has already taken one into Vic and I'm booked into Vic with a 700 tomorrow :/

What's happened since the certification came out ?
 

387star

On Moderation
Joined
16 Nov 2009
Messages
6,657
The recent WON suggested they. Aren't cleared from snowhill tunnel to blackfriars but surely I misread <D
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,506
Location
UK
Rumour:

Nobody can remember if the safety case was completed, several project people are on leave or sick and the paperwork has either gone walkies or doesn't exist.

The paperwork is sitting on my iPad. We were sent it a couple of weeks ago. Considering I'm booked there tomorrow along with half my depot then I'm kinda weirded out.
 

John1975

Member
Joined
21 Aug 2013
Messages
113
The paperwork is sitting on my iPad. We were sent it a couple of weeks ago. Considering I'm booked there tomorrow along with half my depot then I'm kinda weirded out.

**** up

700's not route cleared into vic

Networker substitution
 
Last edited:

Class 466

Established Member
Joined
5 Mar 2010
Messages
1,430
They're cleared operationally, but not for passenger service. Complete oversight on GTRs part.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,325
Bit more than an oversight if they let it get to the point where drivers still think they're working them the day before!
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Excuse my ignorance, but what's the difference?

No wonder our railway is so expensive to deliver.

They can go into the station without tripping power supplies/hitting platforms/being unable to see signals, etc. However, there isn't the necessary equipment, processes, or staff for dispatch, passenger assistance, etc, as mentioned in post 8379
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,506
Location
UK
Bit more than an oversight if they let it get to the point where drivers still think they're working them the day before!

Stop marks briefing sent out
Drivers trained
Staff trained
Unit run into and out of Vic
Route certification sent out
LTP Diagrams changed
STP Diagrams issued

Totally and utterly crazy situation :/
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,189
Stop marks briefing sent out
Drivers trained
Staff trained
Unit run into and out of Vic
Route certification sent out
LTP Diagrams changed
STP Diagrams issued

Totally and utterly crazy situation :/

I wouldn't worry as 700/1 are still not cleared for platform 1 at Three Bridges and platform 3 at Brighton plus 700/0 still can't be permissively work platform 4 at Brighton and the new one from a couple a weeks ago, there's no paperwork for the Selhurst Spurs so a couple of ECS moves current cycle via East Croydon vice West Croydon.
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,223
They can go into the station without tripping power supplies/hitting platforms/being unable to see signals, etc. However, there isn't the necessary equipment, processes, or staff for dispatch, passenger assistance, etc, as mentioned in post 8379

And what would be different for a 700 than for the existing stock?
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,506
Location
UK
I wouldn't worry as 700/1 are still not cleared for platform 1 at Three Bridges and platform 3 at Brighton plus 700/0 still can't be permissively work platform 4 at Brighton and the new one from a couple a weeks ago, there's no paperwork for the Selhurst Spurs so a couple of ECS moves current cycle via East Croydon vice West Croydon.

I was looking at the route cert and there is a long list of prohibitions/ECS/Berthing restrictions. Even 319's had a route restriction going into Vic. One of the hardest part of route knowledge is knowing the restrictions and local instructions.
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,223
Wouldn't it be better if each train carried its own ramp? Another reason for OBS. I've heard too many tales of booked ramps failing to appear.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,506
Location
UK
Wouldn't it be better if each train carried its own ramp? Another reason for OBS. I've heard too many tales of booked ramps failing to appear.

But considering that the OBS doesn't need to be there you will still get a situation where there is no OBS to use the ramp anyway. Not only that, the OBS will still need to contact the Driver to ensure that they don't close the doors and the ramp will then become a safety critical requirement on every train and ... and ... and ..

This isn't a DOO debate but In the interest of further hilarity.. There is an onboard ramp. <D
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,506
Location
UK
However, than you for supporting a requirement for a guaranteed second person on board. Only if the RMT had asked for that..... Noooooooooooooooooooooooooooooooooooooo !
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,223
These 10-12 coach sets should routinely have more than one OBS. Not possible for one person to effectively carry out all the passenger-focussed duties (which is why they don't have time to operate the doors)
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
18,910
What routes do the 700s operate out of Victoria? Are they on lease to Southern?

None yet. They should have operated Thameslink services from Sevenoaks via the Catford loop into the Southeastern side today as Blackfriars is shut.

In the near future they will work some Southern services from Horsham / Littlehampton (peak) / East Grinstead into the Southern side of Victoria as it is too complicated to change the existing 377 diagrams for them only to take over London Bridge Southern services. This ends in May 2018.
 

DenmarkRail

Member
Joined
13 Jun 2016
Messages
665
None yet. They should have operated Thameslink services from Sevenoaks via the Catford loop into the Southeastern side today as Blackfriars is shut.

In the near future they will work some Southern services from Horsham / Littlehampton (peak) / East Grinstead into the Southern side of Victoria as it is too complicated to change the existing 377 diagrams for them only to take over London Bridge Southern services. This ends in May 2018.

Ah okay! I figured they should be easy to transfer between GN, Southern, GatX, since they are all under 1 parent! It would be good if they came down to Portsmouth one day!
 