Firestarter
Member
- Joined
- 15 Sep 2009
- Messages
- 548
Two Platforms at St pancras.
Can any-one tell me why only two through platforms were built at St Pancras lower level. I know Kings cross Thameslink only had two but surely with the GN side planned to join up at St Pancras and the increase of trains especially during the peak it would have made sense too build two additional through platforms. Can anyone tell me if it was even possible to have two additional through platforms/lines built. At the moment we struggle with one broken down train blocking the line, how are we going to cope when the GN join up and a train fails and blocks the line. Lack of vision/ambition me thinks.
All answers on a postcard Lol!!!:
Can any-one tell me why only two through platforms were built at St Pancras lower level. I know Kings cross Thameslink only had two but surely with the GN side planned to join up at St Pancras and the increase of trains especially during the peak it would have made sense too build two additional through platforms. Can anyone tell me if it was even possible to have two additional through platforms/lines built. At the moment we struggle with one broken down train blocking the line, how are we going to cope when the GN join up and a train fails and blocks the line. Lack of vision/ambition me thinks.
All answers on a postcard Lol!!!: