MetroCar4058
Member
- Joined
- 18 Jun 2014
- Messages
- 580
The 3-minute peak frequency through the core can't really be increased, though. What you can do, with more reliable trains, is put the peak extra diagrams that Nexus scrapped for reliability reasons back into the timetable. They were run under DB Regio using 86-88 Metrocars (the 4 unrefurbished units weren't intended to be used).
It was 78. Now it’s 74. One of the ones they cancelled was always a fresh air carrier.