Stephen Lee
On Moderation
- Joined
- 7 Jul 2019
- Messages
- 675
1.Knowing that the Class 360/1 from GA will be deployed to London SP-Corby after electrification, I was wondering if the 360/1s will work in pairs?
2. When Kettering-Corby is electrified, the Class 222 will be replaced by Class 360/1s so I wondered if the 222s will then cascaded to other EMR-IC routes which they will replace the HSTs which will end up making no. of HSTs in EMR decrease.
3.Lastly I wondered what can 360/2 be used for once being replaced by Class 345s in TfL Rail, and if it is possible for EMR to inherit the 360/2s in case the London-Corby Route needs extra capacity.......
2. When Kettering-Corby is electrified, the Class 222 will be replaced by Class 360/1s so I wondered if the 222s will then cascaded to other EMR-IC routes which they will replace the HSTs which will end up making no. of HSTs in EMR decrease.
3.Lastly I wondered what can 360/2 be used for once being replaced by Class 345s in TfL Rail, and if it is possible for EMR to inherit the 360/2s in case the London-Corby Route needs extra capacity.......
Last edited: