158’s were used on these routes long before the 170’s. 170’s worked briefly alongside the 158’s in Central Trains days.How come they aren’t going to be running the Liverpool to Norwich route first? Makes more sense seeing as the 170s used to work that route before the 158s did and the route is in desperate need of a stock upgrade...