Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Yes to both. Back in the 1980s the 16xx Taunton-Bristol stopper regularly went via the Marsh to avoid having to run round at TM before forming the 17xx return.
I used the 17xx Taunton most working days in the 80's and didn't know about it either. AFAIR the 1715 ish was ex-Manchester and hoover-hauled.
Anyway I did the 1114 Parkway-Weston today so have ticked off SPM and the Rhubarb Line, 40 years later.
Commiserations to anyone who went for the 1214 which was cancelled. (un?) fortunately for me a 158 came down ECS to form my intended 1329 back. Otherwise I'd have had to spend another 2 hours in The Fork & Ale pub and consume several more of their wide range of excellent ales!
Just a note to anyone who is going tomorrow (Friday) - they are a set short at SPM for service, so depending on the allocations overnight, the turn *MAY* be a unit.
Looks like the
11:14 Bristol Parkway to Weston-Super-Mare
12:29 Weston-Super-Mare to Bristol Parkway
14:14 Bristol Parkway to Weston-Super-Mare
15:29 Weston-Super-Mare to Bristol Parkway
Services have been cancelled today judging by Journey Check
13/08 1600: Engineering overrun at Bristol, handback now expected on Saturday night. Train plan has been created and will slowly be uploaded to online journey planners. Currently, all buses are in journey planners and northbound services have been amended. Westbound services yet to be changed. Please advise passengers to check journeys for Saturday in the morning.
13/08 1600: Engineering overrun at Bristol, handback now expected on Saturday night. Train plan has been created and will slowly be uploaded to online journey planners. Currently, all buses are in journey planners and northbound services have been amended. Westbound services yet to be changed. Please advise passengers to check journeys for Saturday in the morning.
I can't see any evidence of that! Most journey planners are still showing rail services so that is going to confused a lot of people! Indeed XC are saying on their site replacement buses won't be added to journey planners and will operate as a turn up and go service - whatever that means!
I can't see any evidence of that! Most journey planners are still showing rail services so that is going to confused a lot of people! Indeed XC are saying on their site replacement buses won't be added to journey planners and will operate as a turn up and go service - whatever that means!
The lack of bus timetable in these situations I do find frustrating at times, "a bus service is in operation " doesn't give the public much faith, if they don't know when!
The lack of bus timetable in these situations I do find frustrating at times, "a bus service is in operation " doesn't give the public much faith, if they don't know when!
Conversely, actual rail replacement buses (particularly for frequent shuttle) don't follow much of a timetable anyway, just departing when ready and loaded)
To give credit where its due, at least some replacement buses were added to the journey planners overnight which gave me enough confidence to try them rather than the regular bus or taxi (the main issue with them not being in the timetable is I've no clue if I need to give myself an extra half hour, or hour, or whatever - with them in the timetable even if not exact I had a feeling for when to get there for so I could still get where I was going for the same time), and to be fair I was straight onto a coach which waited for about ten mins to fill up a little and then took 15 mins to get to Parkway. So well done GWR / XC.
Conversely, actual rail replacement buses (particularly for frequent shuttle) don't follow much of a timetable anyway, just departing when ready and loaded)
I spoke too soon about the buses. Whilst the morning was great, the evening was less so. The last train southbound from Birmingham was ten mins late into Bristol Parkway due to following a late running ECS move from Gloucester to Parkway. That meant we missed the last replacement bus to Temple Meads and nearly all staff had packed up and left, leaving what I think was about 20 of us hanging about wondering if anyone was around before I went to find a dispatcher who then found the station manager for us to organise taxis.
Pretty poor form for the last bus not to be held for the service it was supposed to be connecting with - the last train from Birmingham was originally timetabled to Temple Meads before the engineering overrun, and so that last bus was supposed to be the connecting replacement for it. Or at the very least if there were operational reasons for not being able to hold it they should have had staff on the platform meeting people off that train to work out onward journeys - actually being proactive rather than expecting passengers to find staff, which at Parkway, when there's only a couple of staff members about late at night can be pretty difficult. The cynic in me would say they just hoped people would deal with taxis etc themselves but that may be too harsh.
Many problems around the Bristol/Taunton area today, affecting trains to and from the West Country and the North.
Is this a sudden problem or has it been ongoing due to line closures in the Bristol area?
Many problems around the Bristol/Taunton area today, affecting trains to and from the West Country and the North.
Is this a sudden problem or has it been ongoing due to line closures in the Bristol area?
Actually a signalling cable fault in the Uphill Junction area. All signalling at Uphill Junction was affected. That includes the Up Main and the Down Main.
It has nothing to do with the engineering works at Bristol.
RailUK was launched on 6th June 2005 - so we've hit 20 years being the UK's most popular railway community! Read more and celebrate this milestone with us in this thread!