An improved journey time for Leeds – Manchester Victoria of 43-44mins. (This Scheme delivers on this journey time improvement aim through the provision of dedicated fast lines, increased fast line running speeds of 100mph and electrification throughout the extent of the Scheme route)
An improved journey time for York to Manchester Victoria of 67-69mins. (This Scheme delivers on this this journey time improvement aim through the provision of dedicated fast lines, increased fast line running speeds of 100mph and electrification throughout the extent of the Scheme route)
Capability to operate 8 ‘express services’ an hour on the route. (This Scheme delivers on this capacity improvement aim by removing the existing bottleneck through the provision of a four track railway throughout the Scheme route, removing conflicting train movements at Ravensthorpe through the provision of a grade separated junction and improving train movement capacity at Huddersfield Station through the provision of additional platform capacity and track layouts)
Capability to operate 6 ‘local services’ an hour on the route. (This Scheme delivers on this capacity improvement aim by removing the existing bottleneck through the provision of a four-track railway throughout the Scheme route so allowing for the relocation of the ‘express’ services to the new dedicated fast lines. It also delivers on this capacity improvement aim by improving the capacity of local stations at Deighton, Mirfield and Ravensthorpe)
Performance of the NTPR to be 92.5% (PPM) or higher each period. (The Scheme delivers on this reliability aim by removing the existing bottleneck through the provision of a four track railway and the electrification of the railway throughout the Scheme route, removing conflicting train movements at Ravensthorpe and providing upgraded modern railway equipment throughout the Scheme route)
Freight paths/rights to be retained as existing. (This Scheme delivers on this freight capacity aim by removing the existing bottleneck through the provision of a four-track railway throughout the Scheme route so allowing for the relocation of the ‘express’ services to the new dedicated fast lines which allows for freight to run on the slow lines with the ‘stopper’ services); and
A contribution to Network Rail’s Decarbonisation Strategy and climate policy. (This Scheme contributes to Network Rail’s strategy and policy by delivering the electrification of the railway throughout the Scheme route).