When cancelled HS2 money was reasigned to Northern levelling up, I wrote to the DfT suggesting £120M (costed in 2016 at £99M) to electrify the Harrogate Loop which would mop up redundant 323s reducing journey times by 1 minute per station stop on acceleration alone, release 9 diesel units, increase iine speed to 75mph and allow London trains to operate on electric.I do wonder if this is quite possibly why the line is to be upgraded
Well it certainly wont be covering electrification!
Which begs the question what sort of trains can we expect to see ? I think the line would be idea for 170s although theyre unlikely to be redeployed unless the Harrogate line is upgraded and electrified!
The reply was an emphatic NO.
What hopeless times we live in without common sense.