The 73/9 modification was specified to haul RHTT and other Infrastructure trains. This was then stretched to haul mark 3 sleepers. This was then stretched to haul the much heavier Mk5 sleepers with their much higher ETH load. There's also been creep with the challenging Fort William route increasing to 5 coaches for much of the year.As in, not meeting what they were specified to be able to do?
It would be interesting to know how much power at the rail a 73/9 has hauling 5 Mk5 s.