I'm not sure that you could squeeze 34MW of power from any source into a 9 car unit. It's as much as a major marine propulsion unit.
This is a world that can put 1030hp into a Tesla Model S 'Plaid' and still have it look more or less like an ordinary electric car
Or uses lithium ion batteries to power fuel pumps on
space launch vehicles.
The power to weight ratios available from lithium batteries and modern motor designs are
enormous.
A 9 car unit could have 36 traction motors. AGV motor bogies are supposedly rated at 760kW per motor
continuous, with two motors contained in the bogie frame.
36 x 760kW is 27 megawatts continuous.
60 second ratings will be substantially greater than that, and the AGV motor design is over 15 years old at this point.
You also have to apply it through the wheel/rail interface with a coefficient of friction of 0.3 at best, dropping to 12% or lower on wet greasy rail. Also, as the speed increases so does the Davis Equation drag, reducing the tractive effort/force available for acceleration.
Yes, I believe the objective is to be traction limited through the entire operational speed range.
IMagine a train that takes off like a tube train and keeps doing that all the way to the speed limit.
Drag forces are fairly small next to the forces needed to acceleration at 1.3m/s^2.
My old AGV brochure suggests that on the flat a 11-car AGV will have a total resistance to movement force at 200km/h of just under 30kN.
NTV's 11-car AGVs weigh 410 tonnes or so, which suggests a reduction in acceleration of around 0.07m/s^2 due to drag/rolling resistance forces.
Imagine the O S Nock write up!
ALmost worth building it and a time machine to find out!
EDIT:
Providing 34MW of peak (5-minute rating) power output from BYD blade cells would require 22,200 cells weighing about 57 tonnes. Those batteries would store about 10MWh.
In reality you would only be applying 34MW right at the end of acceleration for a matter of seconds.
EDIT #2:
At 200kph the train, assuming similar aerodynamics to an AGV, would only be drawing 1.7MW. So your 25kV power system probably only has to be able to draw 2MW to keep the batteries charged on average. Compared to traditional traction transformers of 5MW or so (see Pendolino), a 2MW ultra modern high voltage switch mode converter will weigh almost nothing.