• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by Kneedown

  1. Kneedown

    TRIVIA - “reversing loops”

    As does Woodhouse and Dronfield. On the plus side, I'm working 1F00 tomorrow. Not a bad little diagram!
  2. Kneedown

    Setting the DRA

    Tried it on a 360 once to see if it did knock the dynamic brake out. If it did I didn't notice much difference.
  3. Kneedown

    Setting the DRA

    That's a strange one. I drove HSTs with EMT/EMR for years, and I've never had the brakes go on, on the occasions I've deemed it appropriate to apply the DRA on the move. Brake release is also possible with the DRA applied, hence the extra vigilance necessary to ensure it is reset before...
  4. Kneedown

    Class 810 for East Midlands Railway Construction/Introduction Updates

    003 was on the Service Platform (7) 16.30ish.
  5. Kneedown

    Setting the DRA

    Just to add to previous answers, whilst it is permissible to set the DRA before coming to a stop in the platform, be aware that on some traction, setting the DRA may render the dynamic brake inoperative, so you will be relying on discs and pads only. I seem to remember 323s were affected by...
  6. Kneedown

    "Window may spring upward unexpectedly"

    Not restricted to units either. I've had a split lip from a 31 window shooting up suddenly back in the day.
  7. Kneedown

    Class 810 for East Midlands Railway Construction/Introduction Updates

    Yep, but Wellingborough seems to be an exception to that for some reason. There was a notice up about it a while ago.
  8. Kneedown

    Class 810 for East Midlands Railway Construction/Introduction Updates

    With the exception of Wellingborough on the Down Fast, where a 4 car 360 has to go to 8 car 360 board, and not the SDO 5 board. Totally agree re the Thameslink boards. It's a farce and a half mate!
  9. Kneedown

    Class 810 for East Midlands Railway Construction/Introduction Updates

    "SDO 4.5" signs! That would be something to see. Strange thing is, the 180s were SDO 5 at Long Eaton due to the end doors being Crew only.
  10. Kneedown

    Class 810 for East Midlands Railway Construction/Introduction Updates

    More recently, full Driver open/Guard close was in effect on the 180s for the short time we had them. I'm led to believe the the SDO selection will be automatic, presumably with the associated "as long as", and "unless's", so not sure if that would affect the current agreement?
  11. Kneedown

    Are Train Crew Shortages Spreading to EMR?

    Rest Day Working agreement has expired, and negotiations for renewal have stalled.
  12. Kneedown

    MML Electrification: progress updates

    I would say so as, pausing apart, the actual MML work has proceeded quietly, efficiently, and competently. Hats off to the guys and gals of SPL.
  13. Kneedown

    MML Electrification: progress updates

    I was chatting to one of our other Instructors last week who is closer to the 810 project than I am currently, and he confirmed that the power changeover boards for Sharnbrook are not going to be installed, so ac operation from Wigston right through to Pancras. The boards already in place...
  14. Kneedown

    Class 810 for East Midlands Railway Construction/Introduction Updates

    No 180s or HSTs to take up the slack = less maintenence time for 222s. They're on depot for fuel, quick clean, then out in traffic again. It's even hard to get on a 222 on nights at Etches for Driver training as the turnround is so short. I was lucky to be allowed 30mins on a set last week, and...
  15. Kneedown

    Class 810 for East Midlands Railway Construction/Introduction Updates

    And it's showing. In the last few weeks I've had exactly 2 Meridians with all engines running, and one 5 car came off Etches and entered sevice with 2 engines isolated. Performance is shocking currently.

Top