TurboFintan
Member
Hello guys, first post from me!
I am making a scenario for the TS2017 Train Simulator game and I want to re-create the overnight trains that went via the Settle & Carlisle line in the mid 70s. I believe the down train was the 21:30 St Pancras to Glasgow via Leeds and the up train being the 22:50 from Glasgow to St Pancras. Being specific the year was 1975.
I believe the down train had a formation of:
Corridor Second (detached at Nottingham)
Corridor Second (detached at Nottingham)
Sleeper Composite (attached at Nottingham)
Sleeper Second (attached at Nottingham)
Corridor Second
Corridor Brake Second
Corridor Second
Corridor Second
Corridor Composite
Brake Van
Brake Van (detached at Leeds?)
So, I am curious as to know what stations they called at and what times they arrived/departed the stations. Also please correct me if I got the services and/or formations wrong!
Much appreciated!
I am making a scenario for the TS2017 Train Simulator game and I want to re-create the overnight trains that went via the Settle & Carlisle line in the mid 70s. I believe the down train was the 21:30 St Pancras to Glasgow via Leeds and the up train being the 22:50 from Glasgow to St Pancras. Being specific the year was 1975.
I believe the down train had a formation of:
Corridor Second (detached at Nottingham)
Corridor Second (detached at Nottingham)
Sleeper Composite (attached at Nottingham)
Sleeper Second (attached at Nottingham)
Corridor Second
Corridor Brake Second
Corridor Second
Corridor Second
Corridor Composite
Brake Van
Brake Van (detached at Leeds?)
So, I am curious as to know what stations they called at and what times they arrived/departed the stations. Also please correct me if I got the services and/or formations wrong!
Much appreciated!