To your first point, I assume that you realise that in the decade from 1920 to 1930 the number of cars registered for use on the road (which can be taken as a proxy for 'ownership') increased FIVE TIMES? In the subsequent decades to 1980, with the exception of the hiatus caused by the Second World War, the rate of increase in the number of cars registered for use on the road then dropped, only doubling every 10 years. Since then the number of cars registered for use on the road has continued to increase, but not as quickly.High car ownership only because of public transport poverty. Rapid car ownership followed Beeching cuts.
No it isn't. It provided a service that was there and taken away by a system that only looked at money not hardship. It has provided the Borders with a very good service much quicker and more comfortable than bus and opened out the Borders to incomers and tourists.
It is usually a case of those that already have complaining about those that are without wanting a rail connection.
Going on about the real or imagined 'wrongs' decisions that were made 50 years ago - we woz robbed! - will not open, or re-open, a single inch of railway.I will keep on going on about the wrongs of the past until someone actually does something to put them right.
At least with the support of the Task Force, there's more chance of the appropriate analysis being done and the case being made.
Going on about the real or imagined 'wrongs' decisions that were made 50 years ago - we woz robbed! - will not open, or re-open, a single inch of railway.
By the very fact of subscribing to this Forum its members show they are interested in railways, the corollary is that many, if not most, would like to see more railway rather than less.
I include myself among these, I would be delighted if the link between Exeter and Plymouth via Okehampton (among others) were to be reinstated. But one has has to realise that the money has to come from somewhere - and for most infrastructure projects this means from the Government. In some cases there might be some reusable alignment, but as far as the Law and raising money goes, one is building a new railway.
He who pays the piper calls the tune - which means that one has to play by the Government's rules. These are quite clearly set out here. To stand any chance of success this process must be followed.
If you a serious about getting railways re-opened, get stuck in! I am trying to do something similar with a conservation area in my town - just bitching butters no parsnips. You have to roll your sleeves up.
Are you talking as someone who knows its all hype or are you ignorant? I suggest the latter as I know you are not party to the latest developments.
Bovis Homes and LiveWest to deliver 398 new homes in Tavistock
15 October 2018
National housebuilder Bovis Homes has entered into a joint venture with housing provider LiveWest to build 398 new homes in Tavistock.
The partnership between LiveWest and Bovis Homes combines the south west region’s largest housing provider with one of the UK’s leading home builders.
Construction work at the development, located off Callington Road, is anticipated to start in early 2019, with the first homes set to be completed by the end of next year.
Bovis Homes gained outline planning approval for the site in 2015. The initial phase comprises 398 homes to be built over the next seven to eight years and there is the possibility of the development being extended to build 750 new houses.
Some 330 of the initial phase of new homes will be sold on the open market, while 68 will be affordable homes.
As part of the project, the joint venture will be making financial contributions towards a new school in the area as well as play provisions and local bus services.
Russell Baldwinson, LiveWest’s Executive Director of Development, said: “LiveWest are delighted to have entered into their first 50:50 joint venture project with Bovis Homes to deliver 398 new homes.
“LiveWest are continually looking at ways of providing new affordable accommodation for our customers throughout the south west, particularly in areas of high affordable need.
“We look forward to working closely with Bovis Homes to ensure the scheme and our new working relationship is a success to enable further collaboration in the future for the benefit of both organisations and our customers.”
John Lougher, Bovis Homes’ Strategic Land Managing Director, said: “After progressing this site through the planning process, we’re very pleased to be taking it on to the next stage in its evolution in joint venture with LiveWest.
“We are committed to delivering a high-quality development of much-needed new homes, and looking forward to getting started on site next year.”
The development will offer customers a range of modern, comfortable and affordable homes, conveniently located on the edge of Tavistock and within easy reach of Plymouth and Dartmoor National Park.
You should apply for a job at the DafT with that attitude. You would be sure to get it.
You must be one of these complainers with a good rail service.
Just switch off your brain for a minute and consider the possibilities. Your suggestion of a route following the A38 would still have a gradient similar to west of Newton Abbott even if partly in tunnel. Still limiting freight train weights per loco. The LSWR route is more gradual and freight train friendly.
Do you really think a new line is going to be built? You must still believe in Father Christmas. A reinstated LSWR route is still much cheaper. We are talking of alternatives to the coastal route when closed in an emergency not how the population spread of various North Devon towns would pay for the route to reopen. Once open it would be used as railheads of Tavistock and Okehampton have a large catchment.
Not all users of trains are rail enthusiasts and not all users have a car or can drive. I can't drive since having a stroke this year so don't insult the disabled.
Idiotic to infer we are seeking to reinstate rail to every hamlet. "Connecting Communities" recommended all towns 15,000 and over that could be connected should be connected if possible unless within 4 miles of an already rail connected town.
It's a start! But I'm afraid it won't be a very productive one - the person has already come down against the re-opening. Complaining won't work.Well I did write to the leader of Plymouth Council after he spoke out against reopening the route.
That just isn’t how franchised TOCs operate, unfortunately. Extending the historic LSWR for little more than nostalgic reasons is a suggestion made many times in this thread, but it would only happen if it suited DfT. The SWR or successor TOC couldn’t do it unilaterally. If GWR are running Okehampton to Exeter by the end of their franchise (as already proposed) wouldn’t they become the obvious TOC to extend anyway?If SWR are still in business (not a given at the moment!), they would want a slice of the West Country cake, just as the SR did, by extending some Waterloo - Exeters to Plymouth.
It's a start! But I'm afraid it won't be a very productive one - the person has already come down against the re-opening. Complaining won't work.
What is necessary is find out why he/she was against re-opening. Were they afraid that they would lose money intended for some other project? Did they expect their district would have to contribute? And any one of many such reasons or fears.
You, or the action group(s) promoting the reopening, will have demonstrate that there is a benefit to this person if the line reopens. This could be financial; it could be that it assists the local Council in meeting its planning objectives and policies; or one of many other reasons. You have to demolish each of the arguments raised against re-opening - in detail, with figures that are based on facts not wishful thinking.
You will need to identify sources of money, work with the Local Enterprise Partnerships, local councils, politicians, businesses, local community associations, local rail action groups. Look at the way that the East-West Rail Consortium has campaigned for years to get the Cambridge - Bedford - Bletchley - Oxford line reopened. Finally, it's happening.
What will NOT work is to simply say that village or town XYZ deserves a rail service because it used to have one. If you say that NOBODY will open the door for you again. You'll be classified as a railway enthusiast and be discounted as a nutcase.
It will not be easy and it will take a long time. You will have to give up a lot of your free time.
Best of luck.
Why are you so bitter? I hate travelling by bus as do most people. They only do because they have to. Given the choice, it would be train.A direct 'new line' is what is required. Anything else is second rate. Aim high. Whether I believe in Father Christmas is irrelevant. Not sure why freight train weights per loco are really an issue (virtually no freight on the railway) and the technology is now available to increase loco power to cope with this in the UK context.
Play the 'insult to the disabled' card if you like, but carrying passengers who do not have a car or cannot/won't drive to small towns is quite possible by road transport service, rather than paying millions to re-open bucolic secondary lines of yesteryear as a priority.
'Connecting communities' - a rail industry report banging their own drum to increase dependency on rail and secure their own future. They would make that kind of recommendation wouldn't they!
That just isn’t how franchised TOCs operate, unfortunately. Extending the historic LSWR for little more than nostalgic reasons is a suggestion made many times in this thread, but it would only happen if it suited DfT. The SWR or successor TOC couldn’t do it unilaterally. If GWR are running Okehampton to Exeter by the end of their franchise (as already proposed) wouldn’t they become the obvious TOC to extend anyway?
If LSWR re-opening is to have a hope of succeeding then it needs to take a gradual approach and minimise costs at every stage, while thinking about how later expansion can be made possible without extra cost up front.
So I'd suggest the first stage would be to get a 7-day service running to Okehampton. The track is already there and if that can't be made to work then frankly there's no hope for a line through to Plymouth. Yes the passenger numbers will be lower than a through service, but with no restoration of route the costs will be hugely lower so the ratio of the two should be better. The numbers using Okehampton eastwards would provide a pretty good basis to predict how many intermediate passengers would use a through route. The next stage would be Tavistock before attempting to get funding for the link between the two.
I'd suggest also that the infrastructure is kept basic, single with loops aiming to support an hourly Sprinter service, but hopefully avoiding the error on Borders of saving small amounts by rebuilding bridges for single track with no easy method of doubling them. At times of blockage via Dawlish 80x units could run in the same paths instead, to provide capacity for through passengers and serve the local stations by Selective Door Opening rather than requiring full-length platforms.
Any suggestion of through-running beyond Exeter at this stage merely complicates the project and creates more things that have to go right for it to succeed. The time for such refinements is after the route is reinstated.
If LSWR re-opening is to have a hope of succeeding then it needs to take a gradual approach and minimise costs at every stage, while thinking about how later expansion can be made possible without extra cost up front.
So I'd suggest the first stage would be to get a 7-day service running to Okehampton. The track is already there and if that can't be made to work then frankly there's no hope for a line through to Plymouth. Yes the passenger numbers will be lower than a through service, but with no restoration of route the costs will be hugely lower so the ratio of the two should be better. The numbers using Okehampton eastwards would provide a pretty good basis to predict how many intermediate passengers would use a through route. The next stage would be Tavistock before attempting to get funding for the link between the two.
I'd suggest also that the infrastructure is kept basic, single with loops aiming to support an hourly Sprinter service, but hopefully avoiding the error on Borders of saving small amounts by rebuilding bridges for single track with no easy method of doubling them. At times of blockage via Dawlish 80x units could run in the same paths instead, to provide capacity for through passengers and serve the local stations by Selective Door Opening rather than requiring full-length platforms.
Any suggestion of through-running beyond Exeter at this stage merely complicates the project and creates more things that have to go right for it to succeed. The time for such refinements is after the route is reinstated.
If LSWR re-opening is to have a hope of succeeding then it needs to take a gradual approach and minimise costs at every stage, while thinking about how later expansion can be made possible without extra cost up front.
So I'd suggest the first stage would be to get a 7-day service running to Okehampton. The track is already there and if that can't be made to work then frankly there's no hope for a line through to Plymouth. Yes the passenger numbers will be lower than a through service, but with no restoration of route the costs will be hugely lower so the ratio of the two should be better. The numbers using Okehampton eastwards would provide a pretty good basis to predict how many intermediate passengers would use a through route. The next stage would be Tavistock before attempting to get funding for the link between the two.
I'd suggest also that the infrastructure is kept basic, single with loops aiming to support an hourly Sprinter service, but hopefully avoiding the error on Borders of saving small amounts by rebuilding bridges for single track with no easy method of doubling them. At times of blockage via Dawlish 80x units could run in the same paths instead, to provide capacity for through passengers and serve the local stations by Selective Door Opening rather than requiring full-length platforms.
Any suggestion of through-running beyond Exeter at this stage merely complicates the project and creates more things that have to go right for it to succeed. The time for such refinements is after the route is reinstated.
There's nothing saying that SWR couldn't run semi fast services (Exeter, Okehampton, Tavistock and Plymouth only) and GWR run stopping services along the line, in the same way that other TOC's do on other lines.
Yes GWR wouldn't be able to compete on speed, however there would still be those who opted to use their services (maybe not end to end) as the timings of their services would still be better. For example being able to leave home 10 minutes later than the previous service and getting to Exeter/Plymouth 5 minutes earlier than the next service could be enough for people to use it. Especially if it allows them to hold the next service in reserve by aiming to get the train before the one you need to get incase of delays.
It's also worth considering that by being able to run between Exeter and Plymouth rather than two branch line it makes managing trains easier and probably wouldn't increase the number of units in service. Especially as even the stopping services are likely to be able to run faster over their existing sections and you also remove the need for four lots of buffer in the timetable at each end of the journey (even through you may have slightly more time at each of the two ends) which can reduce the amount of idle time.
Chances are, even post Crossrail 2, there would be demand for no more than 2 semi fast services.
Going on about the real or imagined 'wrongs' decisions that were made 50 years ago - we woz robbed! - will not open, or re-open, a single inch of railway.
By the very fact of subscribing to this Forum its members show they are interested in railways, the corollary is that many, if not most, would like to see more railway rather than less.
I include myself among these, I would be delighted if the link between Exeter and Plymouth via Okehampton (among others) were to be reinstated. But one has has to realise that the money has to come from somewhere - and for most infrastructure projects this means from the Government. In some cases there might be some reusable alignment, but as far as the Law and raising money goes, one is building a new railway.
He who pays the piper calls the tune - which means that one has to play by the Government's rules. These are quite clearly set out here. To stand any chance of success this process must be followed.
If you a serious about getting railways re-opened, get stuck in! I am trying to do something similar with a conservation area in my town - just bitching butters no parsnips. You have to roll your sleeves up.
There are plenty of good campaigns already out there (just look at the Wealden, which has been going on for many years)
There are indeed some good campaigns out there, and many have achieved success in their objective to reopen lines / stations /improve services. The best campaigns are those that work with the industry in a constructive manner, provide good evidence and reasoning for their proposals, gain consistent and continued local stakeholder support (local authorities and relevant MPs), and listen to feedback.
I’m afraid the Wealden campaign is not one of them.
Given that it has already resulted in studies showing that the route would cover its revenue costs (2008 being the one that springs to mind) I would say that it has done well. One has to wonder what more a good campaign can do (or what these "many" successful reopening campaigns, wherever they may be, have done).
I'm afraid that it is now policy that needs to step up.
I see that the line from Bere Alston to Tavistock has had firm local and regional support for many years, as well as an unassailable justification.
If your faith in the system is justified, residents of Tavistock can look forward to their line being restored in good time, rather than being left peeing in the wind, as appears to be the case at present.
If the justification was unassailable for Bere Alston to Tavistock, it would have happened, just like the number of other new / reopened lines and stations in this country have done. There’s lots of them, I’ve done the list of lines twice before, I’m not doing it again.
And there’s more on the cards; eg the Camp Hill Line is looking very positive, good stakeholder support, great evidence, I think it will happen fairly soon.
Those will be all the ones that were either in the dieing days of BR or Scotland and Wales then.
I would welcome Camp Hill, however its not really comparable as the line already exists.
The line does indeed exist, just like the lines to Ebbw Vale, Alloa, Vale of Glamorgan, Aberdare, Aylesbury Vale, Corby, most of the Robin Hood Line, Oxford - Bicester, etc etc etc. There have been very few line reopenings that have been on completely closed lines: Airdrie-Bathgate, Snow Hill Phase 2 (mostly), Borders, Larkhall are those that immediately spring to mind. I’m sure there’s others.
Back on topic re Bere Alston - Tavistock; I’ve had a good look around, and whilst there have been a lot of reports, mostly by Devon CC, I can’t find any recent appraisals or robust cost estimates for this section alone. (And by robust, I mean prepared or validated by organisations who have something to do with building railways. The £26m estimate by Devon CC is not robust. Even using Borders railway rates, which were comfortably the cheapest of any new railway recently, it would be at least 4 times that now.)
Is there any recent appraisal / estimate out there? I remember the work done about 12 years ago, and that was suspect back then.
Even at the same cost per mile as the Borders route, the Tavistock line would be good value.
If the price has gone up by four times since then, the industry is doing something wrong.
Good value by what measure? That is my point, I can’t find anything that shows it is good value (or bad value, or anywhere in between).
The point about price - you miss my point. Devon CCs estimate was £27m a few years ago. All I’m saying is that if you apply the same cost per mile of Borders, which is known to be the cheapest of all the ‘new line’ reopenings in recent times, at current prices, then Tavistock to Bere Alston would be over £100m. The price hasn’t gone up, it’s just comparing different rates.