Kieran1990
Member
Hi all,
I see on Surrey CC’s website from late July a number of Arriva’s services are either cut down in frequency (Guildford area) or another operator is taking over (Woking area/ Uni of Surrey services)
I know Arriva have lost the contract to operate University of Surrey’s campus service (26/27/38) with Stagecoach taking over with Route 1/2/X1.
A slight bus war starting on the 26/27 route with stagecoach operating the 1 & 2 over the same route at a higher frequency, apart from Uni campus where Arriva will divert via The Chase.
I think there will 7 buses an hour in each direction over this popular circular route of Guildford.
Could this be a sign that Arriva could pull out of the Guildford/ Woking area eventually? They have lost a lot of work in the past 3/5 years. I.e Surrey Hills and Cranleigh depot closed.
I see on Surrey CC’s website from late July a number of Arriva’s services are either cut down in frequency (Guildford area) or another operator is taking over (Woking area/ Uni of Surrey services)
I know Arriva have lost the contract to operate University of Surrey’s campus service (26/27/38) with Stagecoach taking over with Route 1/2/X1.
A slight bus war starting on the 26/27 route with stagecoach operating the 1 & 2 over the same route at a higher frequency, apart from Uni campus where Arriva will divert via The Chase.
I think there will 7 buses an hour in each direction over this popular circular route of Guildford.
Could this be a sign that Arriva could pull out of the Guildford/ Woking area eventually? They have lost a lot of work in the past 3/5 years. I.e Surrey Hills and Cranleigh depot closed.