For some reason I thought they only did 62mph, not sure where my memory got that from!The iLint will do 140kph, which is entirely adequate for just about any UK rail application of hydrogen, so that doesn't really wash as an argument
For some reason I thought they only did 62mph, not sure where my memory got that from!The iLint will do 140kph, which is entirely adequate for just about any UK rail application of hydrogen, so that doesn't really wash as an argument
and don't use the not so green materials batteries use
But surely that only applies to the "ship mooring line" GWML structures?I’d say mining and refining a few hundred tonnes of Lithium etc for a fleet of battery trains on certain routes would be “greener” than mining and refining thousands of tonnes of copper, aluminium and steel for the OLE...
Isn’t it theoretically possible to factor in the use of some recycled metals“greener” than mining and refining thousands of tonnes of copper, aluminium and steel for the OLE...
Isn’t it theoretically possible to factor in the use of some recycled metals
Single cut circuits are always a greater risk clearly as it only requires contacts in one pole of the circuit to be bypassed to produce a potential false relay energisation. By the time I started in Reading Drawing Office in the early 1980s, any new circuits provided as part of a new scheme or alteration would be double-cut, but I think other regions had adopted this rule earlier due to the extra risks of electrification and all the potential current fault paths available where everything is bonded. The big buried cables might sometimes carry conventional relay circuits in some pairs for longer distance functions like override controls for the remote interlockings, emergency alarms for box to box comms if usual methods failed, and sometimes certain route locking functions for bidirectional running between remote relay interlockings, as is common on the GWML west of Didcot.I wonder why the Signal Engineers were so concerned about their circuits being single, not double, cut and the possibility of false feeding in the event of cable damage by augers if their cables were in troughing?
In my experience is it is mixed and the more rural a line is the more likely the cables are buried, especially where there's little intermediate signalling and spacing between equipment is great. There's a security aspect here as well as buried cables are much less likely to be found and removed by metal thieves. Still, for WR, burying the large trunk cables remained policy even on large mainline schemes until well into the 1970s while you are correct that elsewhere they had moved on generally to putting everything in the surface troughing. By the time of the West of England resignalling scheme (Westbury and Exeter) in the early 80s, all new cables WERE in surface concrete troughing however, and all new line circuits were provided double cut. Concrete troughing routes that are sized appropriately for all the cabling can be very hard work to squeeze into the cess sometimes, and potentially very expensive however, something which no doubt had crossed the WRs collective cost-conscious mind, and mole ploughing the largest of the cables first was a much cheaper option. One estimator I worked with reckoned that on a typical 80s relay-based scheme (without buried cables) the costs of the troughing and cables alone could add up to around one-third of the entire cost of the project. That was in fact their ball park high level estimation methodology - work out the extent of the cable routes required and extrapolate from there!I know from personal experience that GEML(E&W), ECML and large parts of the WCML lineside cables of all types were in troughing, what other mainlines direct buried cables? I know a number of secondary lines mole plowed cables - I had a hand in quite a bit of that as well - but I was under the impression that direct burial on mainlines was a GW thing.
OHLE lasts a lot longer than batteries.I’d say mining and refining a few hundred tonnes of Lithium etc for a fleet of battery trains on certain routes would be “greener” than mining and refining thousands of tonnes of copper, aluminium and steel for the OLE...
Fair point.OHLE lasts a lot longer than batteries.
Charging and discharging a battery uses energy. Typically a battery system is at best 80% efficient although this may be worse if high charge/ discharge rates are involved. In comparison a decent electrification system can be 95% efficient.
Shame their control areas weren't to be electrified (unless there's some overlap round Newbury?).By the time of the West of England resignalling scheme (Westbury and Exeter) in the early 80s, all new cables WERE in surface concrete troughing however, and all new line circuits were provided double cut.
At the end of that time the copper is very easily recyclable, although a proportion of it will have worn away. Most of the steelwork lasts longer but can also be recycled. Recycling a battery of any type is going to be more difficult.Lithium batteries also degrade quite quickly, whereas the contact wire can last for a couple of decades, especially on lower trafficked routes where these battery solutions are suggested, whilst the catenary and masts will be good for many decades.
It was more than just that. Barking to Gospel Oak is a route of two halves; one elevated, one mainly at ground level or in a cutting. In Walthamstow, where the line is in a cutting, it was decided to lower the track rather than reshape the bridges and so a six month blockade was imposed. During that period, they should have erected the masts on the elevated section but they didn't. When at last the Walthamstow section was completed, they realised they hadn't done the elevated section and a second blockade became necessary! Bombardier then entered the fray. Their trains were several months late and so a further delay occurred.A classic case of the design contractor not doing enough on the ground survey work then internally outsourcing the bulk of the detailed design work overseas to people who have/had never to the London let alone Gospel Oak to Barking resulting in an unbuildable/unworkable design. Then there were the rule change issues and all the other issues faced by other schemes.
Adapting the classic surveyors /civils saying "You pay for the survey now or even more later"
I read an article somewhere a while ago that suggested most electric vehicle batteries will be incinerated at end of life. How true that is I'm not sure.At the end of that time the copper is very easily recyclable, although a proportion of it will have worn away. Most of the steelwork lasts longer but can also be recycled. Recycling a battery of any type is going to be more difficult.
I’d say mining and refining a few hundred tonnes of Lithium etc for a fleet of battery trains on certain routes would be “greener” than mining and refining thousands of tonnes of copper, aluminium and steel for the OLE...
Although you still have lower energy efficiencies with batteries compared to OHLE.
For a high speed or heavy freight application you'd have to have so many batteries that more batteries would be needed to provide the power to accelerate all the batteries. Roughly the same applies to hydrogen tanks. There wouldn't be much space/weight available to carry anything useful.But, as above, negligibly so.
No overlap I believe. In most other respects, the 80s WR signalling WASN'T designed for OHLE unfortunately (track circuit types and configuration, signal structures etc), so when wires eventually arrive in the peninsula, there'll be a lot of work to do, although full resignalling should be more than due by then again anyway! Some parts of the Bristol mainline were adapted for electrification before it happened. For example Didcot - Swindon was resignalled with SSI in the early 90s with full electrification provision, including the signalling structures; that was the so-called 'ESI(P)' scheme (electricity supply industry (privatisation)), a freight sponsored project to provide additional running lines between Wantage Road and Challow and make some detailed layout changes to cater for coal trains from Avonmouth running round just to the west of Didcot station.Shame their control areas weren't to be electrified (unless there's some overlap round Newbury?).
Of which neither the coal trains nor the power station still exist. But I guess the railway got something out of it.a freight sponsored project to provide additional running lines between Wantage Road and Challow and make some detailed layout changes to cater for coal trains from Avonmouth running round just to the west of Didcot station.
What? Why would you erect catenary and then spend even more money hooking batteries up to it?Hydrogen and Batteries would be better in the main as a separate function from the railway feeding into its supply (like Sizewell or Drax) rather than being on train in the main in my view due to greater efficiencies. However the politicans seem intent on passing the costs to the private sector, the train builders and lessors rather than Network Rail in the public sector and the OLE wires or 3rd Rail.
Hydrogen and Batteries would be better in the main as a separate function from the railway feeding into its supply (like Sizewell or Drax) rather than being on train in the main in my view due to greater efficiencies. However the politicans seem intent on passing the costs to the private sector, the train builders and lessors rather than Network Rail in the public sector and the OLE wires or 3rd Rail.
The idea is to store surplus renewable energy when supply exceeds demand and use it when demand exceeds supply.What? Why would you erect catenary and then spend even more money hooking batteries up to it?
What? Why would you erect catenary and then spend even more money hooking batteries up to it?
No batteries attached to the Caternary.What? Why would you erect catenary and then spend even more money hooking batteries up to it?
The idea is to store surplus renewable energy when supply exceeds demand and use it when demand exceeds supply.
Because you can collect energy from regenerative braking, storing it into batteries and then use it for powering trains - an ideal spot for such battery storage in general would be a site like the Lickey Incline. It has the potential to manage the demands placed on the National Grid by further electrification, and indeed, has the potential to use the AC OLE network to move power around overnight to smooth out demand during the peak hours.
It's not entirely clear whether such storage would be best within the 25kV network, on the wider HV transmission grid, or a bit of both.
Or you just do what happens now, and use that power to boil kettles, run TVs, run factories etc.Because you can collect energy from regenerative braking, storing it into batteries and then use it for powering trains - an ideal spot for such battery storage in general would be a site like the Lickey Incline. It has the potential to manage the demands placed on the National Grid by further electrification, and indeed, has the potential to use the AC OLE network to move power around overnight to smooth out demand during the peak hours.
London Underground looked at installing flywheel storage for this purpose a long time ago. Stations were suggested as a good location for such distributed storage as, particularly on the Tube, there's a lot of stopping and starting in the vicinity! I don't think it went any further than outline studies though. Such a solution's time may have come now although it may be better to incorporate moderate storage capacity on-board for similar purposes that would also give an emergency get to next station capability in the event of a supply outage and to be able to shunt around depots and sidings without the risk to the staff of live conductor rails in such areas.Because you can collect energy from regenerative braking, storing it into batteries and then use it for powering trains - an ideal spot for such battery storage in general would be a site like the Lickey Incline. It has the potential to manage the demands placed on the National Grid by further electrification, and indeed, has the potential to use the AC OLE network to move power around overnight to smooth out demand during the peak hours.
It's not entirely clear whether such storage would be best within the 25kV network, on the wider HV transmission grid, or a bit of both.
Such a solution's time may have come now although it may be better to incorporate moderate storage capacity on-board for similar purposes that would also give an emergency get to next station capability in the event of a supply outage and to be able to shunt around depots and sidings without the risk to the staff of live conductor rails in such areas.
Presumably it could also be useful if the train was stuck without grid supply to keep the heating/cooling/lights running, even though you would want to try and get it moving ASAP so that you didn't have stuck passengers for too long.Indeed. A 200kw battery pack weighing about a ton would be very useful for a ‘get you out of jail’ use - it would give a four car unit about half an hour at reduced speed. More than enough.