    Does anyone have plans or a link to plans for the final layout of Bletchley after the remodelling is completed? The work seems to have picked up pace in the last few weeks but I have yet to find an actual impression of what's going to change. Any help would be greatly appreciated!
     
  2. Registered users do not see these banners - join or log in today!

    Rail Forums

     
  3. ole man

    ole man Member

    Messages:
    738
    Joined:
    6 Jul 2011
    Location:
    LEC5
    I'm working on there from time to time will get you a final layout this week and post it up here.
    New signal gantry's south of Bletchley and new OLE to suit going up,There is a lot of remodelling work at Christmas this year
     
  4. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,967
    Joined:
    7 Apr 2010
    I found a written description of the work in the CP4 enhancement plans, there doesn't seem to be a great deal in passenger areas that will look much different. Hope it helps anyway:

     
  5. eMeS

    eMeS Member

    Messages:
    422
    Joined:
    12 Jun 2011
    Location:
    Milton Keynes, UK
    Is the carriage sidings still in use? I thought this work had gone to the Siemens facility at Northampton.

    Will the changes allow Bedford St John's & Midland to be accessed from Milton Keynes Central without the need for changing trains?
     
  6. DarloRich

    DarloRich Veteran Member

    Messages:
    19,212
    Joined:
    12 Oct 2010
    Location:
    Work - Fenny Stratford(MK) Home - Darlington
    carriage sidings in constant use! Depot mothballed since siemans facillity at northampton

     
  7. The Planner

    The Planner Established Member

    Messages:
    8,482
    Joined:
    15 Apr 2008
    The driver would still need to swap ends, there won't be a direct link.
     
  8. MK Tom

    MK Tom Established Member

    Messages:
    2,254
    Joined:
    31 Aug 2011
    Location:
    Milton Keynes
    London Midland have said they expect direct Bedford-MKC services by 2013 - it seems to me these works would make that possible by allowing ex-Bedford services to run into platform 3 and out of platform 4... The remodelling and capacity issues on the WCML were their reasons for not doing it sooner.
     
  9. cle

    cle Established Member

    Messages:
    1,600
    Joined:
    17 Nov 2010
    Are these expected to be more popular? It's a baby step towards E/W rail I suppose!

    How did the vegetation clearing go on the line towards Bicester?
     
  10. AlterEgo

    AlterEgo Veteran Member

    Messages:
    11,224
    Joined:
    30 Dec 2008
    Location:
    Milton Keynes
    I'm pretty sure that a direct Milton Keynes - Bedford link will drastically improve the fortunes of the Marston Vale line. It's just a shame that trains will have to reverse at Bletchley. However, I really can't see an alternative given the siting of Bletchley station.
     
  11. al green

    al green Member

    Messages:
    109
    Joined:
    2 Oct 2011

    Attached Files:

  12. swt_passenger

    swt_passenger Veteran Member

    Messages:
    17,967
    Joined:
    7 Apr 2010
    Just comparing the drawing with the text I quoted above, I reckon NR have made a typo in their description.

    This line:

    "the Drayton Road Junction will allow an Up Slow to Up Fast and parallel Down Slow to Down Fast move"

    Doesn't actually make sense. Should it really end with:

    "...an Up Slow to Up Fast and parallel Down Fast to Down Slow move"
     