Hi
Can anyone confirm if there are trains. Southern say engineering work but National Rail Journey Planner say limited trains are running but I think this is an error.
I wonder if it is an error as it looks like it, I would be grateful if someone could confirm.A quick look at RTT for Brighton for the 29th January is showing 2 trains an hour from Brighton towards Victoria, with buses to Three Bridges. The trains to Victoria appear to be going via the mainline as far as I can see (no diversions via Littlehampton or Lewes).
Might be that someone has forgotten to delete the trains from the system
I wonder if it is an error as it looks like it, I would be grateful if someone could confirm.
Thank you, it says a 30 minute service via Haywards heath to Ore and littleHampton.The weekend of 7/8th January there were buses with a very limited service via Littlehampton that only ran early Saturday morning and late Sunday evening. Likely be the same again.
Thank you, it says a 30 minute service via Haywards heath to Ore and littleHampton.
Do know if this is correct?