Hi
Has anyone heard anything recently about plans for re-instatement of platform 5 at bolton? It's just rumour, but there's a post by someone on the Bolton News site who apparently had a 'meeting' with the station manager and the manager stated that the car park was going to be shut (moan, moan, moan) because they're bringing back Platform 5.
I seem to remember there being something in the North West Rail Utilisation Strategy about extending the moses gate loop and opening up a 5th platform, but haven't heard anything since.
near the bottom:
http://www.theboltonnews.co.uk/news/10855686.Fury_as_rail_bosses_slash_number_of_trains_and_carriages_serving_Bolton/?ref=mc
just wondered if i missed something.
Has anyone heard anything recently about plans for re-instatement of platform 5 at bolton? It's just rumour, but there's a post by someone on the Bolton News site who apparently had a 'meeting' with the station manager and the manager stated that the car park was going to be shut (moan, moan, moan) because they're bringing back Platform 5.
I seem to remember there being something in the North West Rail Utilisation Strategy about extending the moses gate loop and opening up a 5th platform, but haven't heard anything since.
near the bottom:
http://www.theboltonnews.co.uk/news/10855686.Fury_as_rail_bosses_slash_number_of_trains_and_carriages_serving_Bolton/?ref=mc
just wondered if i missed something.