Herefordian
Member
And a very apathetic Labour government who, I believe, electrified absolutely nothing or, at the most, a few small infills?
Labour took far too long to buck its ideas up with electrification.
However, the Conservatives haven't done significantly better.
If GWML electrification is ever resumed, it will cost more than if it was allowed to continue in the first place.
MML electrification has been, currently, watered down as far as Corby and Market Harborough. This needs to reach Nottingham and Sheffield.
Why isn't East-West Rail being built as an electrified railway?
However, TransPennine electrification is welcome. Hopefully it's completed in full.