As indeed you keep grumbling about

. With a new fleet provider this was never going to be a quick introduction, Network Rail won’t just let any new train loose on the patch, never mind from a manufacturer they have never dealt with before. Then Crown Point needed rebuilding to maintain them while still trying to run a railway, plus you have had the nonsense of the proposed, now cancelled, maintenance facility at Brantham.
It all makes for a good thesis on how not to introduce new stock, but the naivety of the Abellio bid team, and the DfT for accepting the bid at face value, would be at the heart of the problems. The people now trying to make it all work have been presented with an uphill battle.
Meanwhile quite a few positive comments from passengers on the 19.02 from Liverpool St last night. The 745s do seem to be generally liked so far, so long as they keep going.