I bought an off peak return and anytime single from Portsmouth to Fratton back in February before engineering works were announced on the Portsmouth - Newport route. I was going to go via Reading instead but have just picked up my tickets and seen that they say via Salisbury only. Am I allowed to get the different route to avoid the engineering works or do I need to cancel them and buy new ones?