Back in October, TfL Board papers said 25 were built

I am guessing must be nearer 35 out of the 54 built now (although built doesn't mean have completed tests and ready for shipping).

From memory TfL asked for delayed shipping as the company building the sidings went bust, so didn't have enough space to receive them.
I see. Cheers for that


If this question has been answered already then my apologies however when the B23 stock has fully rolled out will the Stratford to Canary Wharf/Lewisham branch remain as it is with two cars using the existing B07 stock or will it be the full length B23 stock.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

TT-ONR-NRN

Established Member
Joined
30 Dec 2016
Messages
10,541
Location
Farnham
I see. Cheers for that


If this question has been answered already then my apologies however when the B23 stock has fully rolled out will the Stratford to Canary Wharf/Lewisham branch remain as it is with two cars using the existing B07 stock or will it be the full length B23 stock.
The former, its been reported.
 

Thirteen

Member
Joined
3 Oct 2021
Messages
1,169
Location
London
The B07s I suspect will probably be temporarily taken off out of service for a refurb once the B23s are fully in service
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,812
Location
UK
I think I'd rather go frequency over train length, personally speaking.

DLR being an isolated system with mostly flying junctions and system-wide CBTC control makes that a much easier proposition than the main lines.

Perhaps at some point in the next decade when the next DLR extension finds funding (Thamesmead? who knows), they can acquire a few extra trains along with whatever is needed for the new branch.

In the mean time, having the B23s will be an absolute step change in capacity for the DLR. Particularly the all-day Stratford to Lewisham service and more trains to Beckton will be welcome, as well as more full length trains overall since the B23s by design will obviously always be full length.
 
Last edited:

Thirteen

Member
Joined
3 Oct 2021
Messages
1,169
Location
London
I think I'd rather go frequency over train length, personally speaking.

DLR being an isolated system with mostly flying junctions and system-wide CBTC control makes that a much easier proposition than the main lines.

Perhaps at some point in the next decade when the next DLR extension finds funding (Thamesmead? who knows), they can acquire a few extra trains along with whatever is needed for the new branch.

In the mean time, having the B23s will be an absolute step change in capacity for the DLR. Particularly the all-day Stratford to Lewisham service and more trains to Beckton will be welcome, as well as more full length trains overall since the B23s by design will obviously always be full length.
They have 54 B23s and part of those will be used for the proposed extension.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,812
Location
UK
They have 54 B23s and part of those will be used for the proposed extension.

As I understood it, 33 trains was the original order to replace the B9Xs/B2Ks, then 10 trains were ordered for network growth, and 11 more were funded through the Government’s Housing Infrastructure Fund but that wasn't for Thamesmead, it was for extra capacity in the Thames Wharf area. ICBW but I don't think any of the ordered 54 trains area earmarked for Thamesmead. Here's a source backing this up.

Though I suppose it's possible that only a couple of extra trains would be needed for relatively short extension, which might be possible to find through fleet reliability improvements.
 

Taunton

Established Member
Joined
1 Aug 2013
Messages
10,151
Part of the project is rearrangement of the main depot at Beckton, which has led to weekend (including Fridays) restrictions of services. Today this was exacerbated by a train breakdown, actually a rare DLR event, somewhere on the Woolwich branch in the morning peak.

Unfortunately a bit of "headless chickens mode" developed. At Canning Town a train which entered running Wrong Line had three separate destinations showing, one on the platform describer, another on the train cars, and a third being bawled out on the train PA. I didn't know the automated signalling was actually capable of that, and in fact the scrolling message at the bottom of the platform describer was giving a fourth, different again, version of events.

Considerable chaos on the platform particularly by those headed to, and indeed from, City Airport. Lift overwhelmed. One of the part-time platform "Event staff", who only come when something significant is on at Excel, was actually doing a very good job of understanding it all and giving directions to incessant questions. Notably more so than another, who by their seniority title on their hi-viz, should surely have been in a position to Take Charge. But they stayed silent.

Notwithstanding the restricted output from the Beckton depot, there were six cars idle at the Poplar depot throat from before all this started, which would have been quite useful in overcoming the restricted service plan. One got the feeling it was all rather the B Team on duty on the ops side.
 

Top