GlitterUnicorn
Member
I've been looking at the Far North line sleeper proposals again. From the HITRANS report it seems that one of the (many) major factors precluding a service is that the standalone service and unique rolling stock simply costs too much, both to procure and operate.
I know it's far from ideal, but could a DMU - perhaps a 158/a pair of 158s - be converted into a sleeper train? Or as a less drastic refurb airline style lie-flat seats could be fitted? This could leave Thurso or Wick (or both!) at 10 or 11 at night, and then be attached to another DMU to provide the first train of the day from Inverness to Edinburgh. In the reverse direction it could be connected to the last train at night from Edinburgh to Inverness then run alone from there?
Running costs would in theory be much reduced, since there are no locos or a micro-fleet of coaches that require special maintenance and operating procedures. Since it can be attached to regular early morning/late in the evening trains between Edinburgh/Glasgow and Inverness it would drastically reduce costs on this section too. The only limitation would be that the first/last Inverness to Edinburgh trains would have to be DMU operated
I know it's far from ideal, but could a DMU - perhaps a 158/a pair of 158s - be converted into a sleeper train? Or as a less drastic refurb airline style lie-flat seats could be fitted? This could leave Thurso or Wick (or both!) at 10 or 11 at night, and then be attached to another DMU to provide the first train of the day from Inverness to Edinburgh. In the reverse direction it could be connected to the last train at night from Edinburgh to Inverness then run alone from there?
Running costs would in theory be much reduced, since there are no locos or a micro-fleet of coaches that require special maintenance and operating procedures. Since it can be attached to regular early morning/late in the evening trains between Edinburgh/Glasgow and Inverness it would drastically reduce costs on this section too. The only limitation would be that the first/last Inverness to Edinburgh trains would have to be DMU operated