I am just totally lost for words with the forthcoming changes, they can only be drawn up by someone with a self-destruct mission for First Potteries.
Let's start with the 38/A, 39/A and 103.
The 38 is to be the clockwise circular covering what is now the 3A and 4A. At present they start from Hanley as a 4A, a short pause in Newcastle, then at Talke Pits become a 3A with no pause to go back to Hanley. The circuit takes 1hr 35 minutes. With the new timetable, as a 38, the terminus is Talke Pits (aka Butte Lane), then to Hanley with about 5 minutes there, another 5 minutes or so at Newcastle and back to Talke Pits. Assuming they continue to go round they wait for between 5 and 15 minutes before continuing. Astonishingly this now takes typically 2hrs 10 minutes to get round! Why would anyone want to sit at Butte Lane (no disrespect to the location intended) for so long on a journey from Chesterton (say dep 14.11) to Kidsgrove (arr 14.56) - currently it takes 24 minutes. Looks like 4 buses on the 38 so the frequency is about every 35 minutes, but varying between 27 and 42. The 39 is the same in reverse but here the journeys break at Kidsgrove instead of Talke Pits. Another 4 buses required making 8 for the 38/39.
We then have the 38A and 39A. The 38A is clockwise but not all the way round. From Talke Pits (Butte Lane) it follows the 38 all the way round through Hanley and Newcastle to Chesterton then diverges to what First call Waterhayes (but BusTimes calls Crackley). On arriving there it turns round and heads back as a 39A to Talke Pits. A round trip on 38A - 39A looks to take just over 3hrs 30 minutes so with the same frequency of around 35 minutes - these journeys slotting between the 38/39s - I reckon there are 7 buses required.
Finally we have the 103 replacing the Crewe journeys on the 3. Quite sensible to disengage them in a way as deckers can run on the rest of it. At present a round trip takes 2hr 30 mins between leaving Hanley and arriving back. On the new 103, which as far as I can see is the same, a round trip will be typically 2hr 40 mins. This looks like it will be stand alone with 5 vehicles so the frequency is about 35-40 minutes. But not working nicely in between 38/A/39/A journeys, more random.
I think that, at the moment, there are 16 buses on the 3A/4A circular combined with 3 to Crewe and 4 to Crackley - a full cycle takes 8 hours. Add 3 buses on the 3A Talke Pits shorts makes 19. The horrible new mess will, I think, be 20 buses - 8 on the 38/39, 7 on the 38A/39A and 5 on the 103. So that's one more for a terrible mess of a timetable. Unbelievable! Surely the new running times are way over the top - just stick to the current frequencies and feed the extra bus in at Hanley.
Also the 22, 98 and 99, which interwork at Newcastle, switch from each running a straight 30 minute frequency to about every 35 minutes. This is with the same resources but longer running times and longer times at termini.