Grand Central are once again cancelling vast numbers of services this weekend

Yesterday the 1318 Sunderland & 1548 Bradford were cancelled and the 1957 Bradford was curtailed to run only as far as Wakefield. There were inbound cancellations as well.

Today the 952, 1653 & 1822 Sunderland and 1150 Bradford are all cancelled along with all the inbound trips.

Seems to be being blamed on a shortage of drivers, train crew and a fault with rolling stock.

What is notable is that due to their trains already being full LNER are not allowing ticket acceptance. In some cases such as for Sunderland services GC are advising passengers to travel via Derby on EMT and then Cross Country with a vastly extended journey time. For other services GC are saying customers must buy a new walk up ticket to travel on LNER and then ask for a refund later, which won’t be cheap.

It doesn’t seem like a good set of circumstances for Grand Central, and they will be losing business if this carries on.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

greyman42

Established Member
Joined
14 Aug 2017
Messages
4,966
The 1412 Sunderland - Kings Cross was cancelled at York. The train carried on empty after all the passengers had got off.
 

asw22

Member
Joined
23 May 2018
Messages
118
Sounds like Arriva are struggling here as well as at Northern.
 

Andyh82

Established Member
Joined
19 May 2014
Messages
3,557
There is a long list of cancellations for tomorrow as well.
 

800001

Established Member
Joined
24 Oct 2015
Messages
3,619
The 1412 Sunderland - Kings Cross was cancelled at York. The train carried on empty after all the passengers had got off.

It went empty to Doncaster, as Holgate Sidings were full, amd due to only platform's 3 and 5 being available for through trains, the unit needed shifting asap.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,258
Location
Yorkshire
On Saturday, the 1021 from Bradford was canned. It was actually listed in RTT as a CAN so I guess they knew about that one early on
 

Adam0984

Member
Joined
18 Feb 2014
Messages
1,078
Twitter had a list last night of what was planned to be cancelled today
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,258
Location
Yorkshire
On the West Riding route, 4 of 8 trains appear to have been planned cancellations today. Of the 4 that have run, one is running only part of the route (and I am skeptical it will be on time as the ECS to Doncaster is already 30 late)
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
10,052
Location
here to eternity
Whatever happened to the privatised utopia we were promised with open access operators bending over backwards to serve the customer?
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
10,682
Location
Redcar
Whatever happened to the privatised utopia we were promised with open access operators bending over backwards to serve the customer?

When was that promised? Was open access even on the agenda when privatisation was mooted?
 

darloscott

Member
Joined
12 Dec 2013
Messages
774
Location
Stockton
Out of interest - whilst cancelling their own services have the ones run for Northern been running? Admittedly they're only short trips probably easily covered on overtime but if you're short of units surely the evening one that runs from/to depot would be the first to be binned?
 

chrissawer

Member
Joined
6 Nov 2013
Messages
104
Location
Yorkshire
Out of interest - whilst cancelling their own services have the ones run for Northern been running? Admittedly they're only short trips probably easily covered on overtime but if you're short of units surely the evening one that runs from/to depot would be the first to be binned?

The early morning 0702 Hebden Bridge -> Leeds service uses Grand Central stock and has been cancelled for the last two days.

http://www.realtimetrains.co.uk/train/Y27002/2018/07/09/advanced
"This service was cancelled throughout due to a planned cancellation by the train operator (PG)."

http://www.realtimetrains.co.uk/train/Y27002/2018/07/10/advanced
"This service was cancelled throughout due to a problem with the train (M8)."
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
39,182
Location
Yorks
Has the latest slew of problems been largely due to the flakeyness of 180 reliability ?
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,258
Location
Yorkshire
Has anyone else noticed GC's penchant for posting inaccessible service updates (i.e. in a JPG)?
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,258
Location
Yorkshire
Out of interest - whilst cancelling their own services have the ones run for Northern been running? Admittedly they're only short trips probably easily covered on overtime but if you're short of units surely the evening one that runs from/to depot would be the first to be binned?

The afternoon one didn't run yesterday (Monday) - the jury is still out on today
 

Carlisle

Established Member
Joined
26 Aug 2012
Messages
4,144
Whatever happened to the privatised utopia we were promised with open access operators bending over backwards to serve the customer?
Indeed, hopefully countries like France are taking note of our systems flaws before breaking up their national networks in a similar manner
 

monxton

Member
Joined
24 Feb 2015
Messages
38
Yesterday I saw a train in Grand Central livery heading northbound into Winchester :o
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
4,966
The GC problems are definitely worse since they got rid of their HSTs.
 

thejuggler

Member
Joined
8 Jan 2016
Messages
1,186
The early morning 0702 Hebden Bridge -> Leeds service uses Grand Central stock and has been cancelled for the last two days.

http://www.realtimetrains.co.uk/train/Y27002/2018/07/09/advanced
"This service was cancelled throughout due to a planned cancellation by the train operator (PG)."

http://www.realtimetrains.co.uk/train/Y27002/2018/07/10/advanced
"This service was cancelled throughout due to a problem with the train (M8)."

I heard an on platform explanation for this.

"Due to a higher number of trains requiring maintenance than expected."

Not heard that one before!
 

Andyh82

Established Member
Joined
19 May 2014
Messages
3,557
Has the latest slew of problems been largely due to the flakeyness of 180 reliability ?
They’ve been blaming train faults, driver shortages and crew shortages.

Some have still run either ECS or part way, some Bradford’s have only run to Wakefield for example.
 