Apologies for the delay ,but for some reason my laptop has the last log on this as Darios #67.
Back on my PC to read the updates and add bits
Right first of all having had the workings of the N london circuit explained. pillocks was a bit harsh OK?
As regards the estimate of 80m for a new station and track, i was poo pooed by several as to not doing research and making them do it, (which they did not show) and generally mocked..Fair enough, but if you cannot take it, please dont dish it.
SO
From the website Railway Technical costings re new station at Southend Aiprort
This from Railway Technical.com
Network Rail UK 2011 New Station at Southend Airport £12.5million 2-platform facility Built in 23 months
Note Station only. As for the track etc a site of HM treasury has this to say
Recent work for the Department for Transport suggested a new double track high-speed rail line might cost £12-16 million per route-kilometre.
The £12-16m per route-kilometre figure varies according to whether construction is on a disused railway alignment (£12m) or built on green fields (£16m). The figure provides for complete double track new high speed line including track, control systems, power, earthworks and most structures but excluding tunnels, significant structures and stations.
The attached costings are based on existing route distances. It is important to note that it is possible that new alignments would take a different route and so might cost more or less depending on route distance and how much major engineering works such as tunnels (none reqd flat land and no bridges as access is already there) - are needed en route
Note a high speed line not a two road terminus
So as i asked before, even with some rounding up this adds up to a max of 20m for the station and say £40m for the track. Still £20m short of this 80m and even less than some on here were quoting
So show me your figures and i will retract the above
Re The Stanted service
09065 quoted
'The reason that GA could probably not put an additional stop in the up services is because that is likely what the agreement put in place with Stansted Airport says. I wonder, as well as giving away cars at random, do you also conduct protracted contract negotiations? I suspect some of our favourite unions would invite you to discuss their pay discussion needs.'
It is operated by GA as a sub brand. BAA have nothing to do with it unlike the Heathrow Express and Connect services
And if BAA had a finger in its operation, then i would have thought it would have insisted on a non stop run, rather than having three regular stops at Tott Hale, Broxbourne, and Bishops Stortford as well as the odd one timetabled in for Stansted Mountfitchet The last three well known hubs for airline passenger interchange.
And surely if BAA really have some clout/agreement in this how come some down Stansteds have the additional stop at Northumberland park on match days only without them losing paths at the tunnel? (max 12 trains ph) So the argument is flawed as regards the Up stansteds as there IS no problem with the pathing in.
He later said
'How do you propose that passengers traverse from one platform to another and indeed from the platform furthest from your beloved stadium? One hope you are not trying to cut costs by installing a level crossing, especially with Network Rail being decisive to removing as many as possible.'
Hmm you dont know the area do you?
There is an existing LC and access to the up platform is either by footbridge from the downside, or an entrance on the east side of the LC, which by a happy coincidence would also be the entrance to the proposed tube station
Please see the attached google earth pic
Just to explain the area to the right of the station is the old formation of the goods relief lines that ran from Pickets Lock SB in the North to Temple Mills yard. There is enough spare land to build a two road island station between the existing NP station and the TfL building to its right.The two roads would then join the existing tube track and then onto the network
Most of you on here appear to be a genial lot, however there are some, and not all on this thread, who seem to take great exception at any negative views on thier employer.
Baileys Studio ( company in Tottenham) also did a blog on this link is
http://ballystudios.blogspot.co.uk/2012/10/werecently-celebrated-7-years-of.html
although i think he is being ambitious with extending it to Edmonton Green!! the stop at Angel Road would be a ghost station
If you cannot give a rational well thought out answer then dont bother. dont use the old 'Its because' get out. Tell me why and explain it
Either pee or get off the pot!!!!

(hopefully that is a smiley)