GWR Tender for 30 x 4 car EMUs

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,204
Location
West Wiltshire
This is how the provision of rolling stock was envisioned when the railway was privatised, a competitive market where an Operator can choose which supplier offers best value

Basically got existing 387s vs 379s vs 350/2s

Sort of becomes a Dutch auction for the ROSCO, how low a price do they want to offer them with a potential alternative of sitting idle not bringing in any revenue.

Of course it may be that if a fleet exceeds 30 (say 37) then they get offered them all at a job lot price, very handy if you really need 33 as at now.

I do wonder if Porterbrook has got a better offer to take 30 387s so has told GWR they cannot extend. Otherwise why not issue tender for 33 (which is quantity they currently have)
 
Last edited:

irish_rail

Established Member
Joined
30 Oct 2013
Messages
3,870
Location
Plymouth
The idea of replacing the existing modern fleet is madness. Why replace a fleet that crews are fully trained on and fully branded in GWR livery. Not in anyones interest surely to replace the 387s...
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
18,783
Why would they be tendering for 30 units when they currently have 33 (not including the Heathrow Express ones) if they're expecting to keep the 387s?
Probably because one potential bidder can offer 33 units and the other can offer 30. The bidder with 33 units (who also has another spare fleet with 37 units) could potentially offer a deal including the extra 3 units.

I think it's a lot more likely there is a potential future home lined up for the 387s, and this tender is looking into replacing them on GWR.
It is heavily speculated on this forum that there is another operator who would welcome additional 387s, one where allusions have been made to a restoration of capacity starting from September.

The outside option is GWR keep the 387s with batteries to bring the 769 experiment to an end but maybe that should be in a speculative thread.

The idea of replacing the existing modern fleet is madness.
At least it is another relatively modern fleet that is being considered. The interesting thing is whether some sort of refit would be needed to maintain capacity as part of the leasing company's proposal - eg removing the current first class.

Not in anyones interest surely to replace the 387s...
On the GWR side maybe but another operator may see it being in their interest.
 
Last edited:

Melancholia

Member
Joined
21 May 2016
Messages
498
Location
Argleton
The notice reads with my bold text:

"Great Western Railway (GWR) is seeking expressions of interest from suppliers for provision of a fleet of 30 x 4-car electric multiple units (EMUs) to deliver existing London Thames Valley services, to the current sectional running times (SRTs), with at least the same seated and crush laden capacity, from the 1st of April 2023 to the 29th May 2028."

Moreover, it goes on to say "Our current fleet is maintained in house at Reading Depot, supported by a TSSSA. It is our intention that maintenance provision continues in this manner."

It would seem very unlikely that Reading depot could accommodate another 30 units on top of its existing allocation.

Thank you. Didn't fully understand the bold bits. I assumed it meant that the EMUs that they want should be able to deliver a service that the present rolling stock can already.
 

AzureOtsu

Member
Joined
2 Jan 2021
Messages
173
Location
Hove
379s to gwr and 387s to southern???? they must still have their shoe gear equipment for a reason right?
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,467
Why would they be tendering for 30 units when they currently have 33 (not including the Heathrow Express ones) if they're expecting to keep the 387s?

I think it's a lot more likely there is a potential future home lined up for the 387s, and this tender is looking into replacing them on GWR.
It allows Akiem to bid the 379s which should bring the price down on what GWR choose.
 
Joined
1 Sep 2018
Messages
467
Location
Malvern to Minffordd
I doubt it'd be the 350/2s - as they are maintained at the purpose built Northampton depot operated by Siemens for a start, and IIRC Porterbrook wanted to convert them to Battery Bi Modes.

The 379s would make logical sense as they are of the Electrostar family, and if selected I wouldn't be surprised if they were renumbered into a new 387/x subclass.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
18,783
The 379s would make logical sense as they are of the Electrostar family, and if selected I wouldn't be surprised if they were renumbered into a new 387/x subclass.
I'm not sure what would lead to renumbering. They aren't 387s. There is nothing magic which would change them into 387s.

IIRC Porterbrook wanted to convert them to Battery Bi Modes
Just an idea.

I doubt it'd be the 350/2s - as they are maintained at the purpose built Northampton depot operated by Siemens for a start
They are going to have a rather limited future use potential if they have to continue to be maintained at Northampton (although other Siemens depots are available). The main problem with the 350s is that they aren't yet available.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,467
I doubt it'd be the 350/2s - as they are maintained at the purpose built Northampton depot operated by Siemens for a start, and IIRC Porterbrook wanted to convert them to Battery Bi Modes.

The 379s would make logical sense as they are of the Electrostar family, and if selected I wouldn't be surprised if they were renumbered into a new 387/x subclass.
Re numbering them isn't really needed, they are still slightly different since one is AC only and the other is AC/3rd Rail.

The main problem with the 350s is that they aren't yet available.
Agreed, I doubt they will be available for 1st April 2023 at the current rate.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
15,287
They are going to have a rather limited future use potential if they have to continue to be maintained at Northampton (although other Siemens depots are available). The main problem with the 350s is that they aren't yet available.
If I was Porterbrook and the inability to get the 730s into service meant missing an opportunity to re-lease them, I'd be furious. Presumably they're on short-term lease extensions now? If so, I'd be seriously considering terminating regardless if they were re-leased elsewhere unless there were guarantees from DfT that they would be used in future.
 

aleggatta

Member
Joined
28 Sep 2015
Messages
545
How many units are required for the NDL? Could a case be made for all the 350/2's, with all/some of them fitted with batteries/shoegear to facilitate NDL running and having a single fleet of trains? If additional charging time was required could it be done with interworking diagrams? not the most outrageous idea, the core 30 could be transferred and the remaining 7 trialed/converted with some/the rest happening in time. The only limitation I can see of the 350 fleet is the lack of bodyside cameras, which I'm sure could be fitted.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
2,488
How many units are required for the NDL? Could a case be made for all the 350/2's, with all/some of them fitted with batteries/shoegear to facilitate NDL running and having a single fleet of trains? If additional charging time was required could it be done with interworking diagrams? not the most outrageous idea, the core 30 could be transferred and the remaining 7 trialed/converted with some/the rest happening in time. The only limitation I can see of the 350 fleet is the lack of bodyside cameras, which I'm sure could be fitted.

If the full 3tph North Downs timetable was ever implemented, with the full peaks, I believe it requires 10 diagrams?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
18,783
There’s 30 class 321 renatus. Just to add something absurd into the mix :rolleyes:
One of those at 110mph would be an even more lively experience than a 387. Unfortunately they aren't compliant with the requirements of the tender.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
If I was Porterbrook and the inability to get the 730s into service meant missing an opportunity to re-lease them, I'd be furious. Presumably they're on short-term lease extensions now? If so, I'd be seriously considering terminating regardless if they were re-leased elsewhere unless there were guarantees from DfT that they would be used in future.

However, porterbrook also own the 387s, so can facilitate subleasing of the 350s from GWR back to WMT whilst backfilling at GWR with the 387s!

Said arrangement also mean it highly unlikely that the 350s would be offered in the first place!!
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,254
Location
UK
However, porterbrook also own the 387s, so can facilitate subleasing of the 350s from GWR back to WMT whilst backfilling at GWR with the 387s!

Said arrangement also mean it highly unlikely that the 350s would be offered in the first place!!
If there’s anything “new” that will be offered to GWR, it will be the 379s. That being said, I honestly think that GWR will just accept a renegotiated lease with their existing 387s and move on… provided it’s at the right price.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
6,850
The GWR passengers would certainly appreciate the more comfy seats of the 379s when compared to the ironing boards of the 387!
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,254
Location
UK
I presume the First Class 2+1 seating would be removed though.
Why I personally think they’d be more suited for the Cambridge Cruiser, then again they could prove useful on Cardiff runs (should they be taken by GWR).
 

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,233
The 379s would presumably become de-facto 387s - so no more 2-1 seating if they did win the tender.
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,489
Location
London
I’ve not heard anything concrete about these so this is just guess work, but 33x 387 to GTR, 30x 379 to GWR does make sense, especially if combined with the 6x 387s from c2c. I suspect 3 units wouldn’t be too major a loss for GWR, whereas an additional 33x 387s to GTR would come in very handy.. convenient timing too.
 

507020

Established Member
Joined
23 May 2021
Messages
1,864
Location
Southport
I’ve not heard anything concrete about these so this is just guess work, but 33x 387 to GTR, 30x 379 to GWR does make sense, especially if combined with the 6x 387s from c2c. I suspect 3 units wouldn’t be too major a loss for GWR, whereas an additional 33x 387s to GTR would come in very handy.. convenient timing too.
I notice your profile picture is one of the 365s which GWR were supposed to have had… how many of those were there again?
 

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,489
Location
London
I notice your profile picture is one of the 365s which GWR were supposed to have had… how many of those were there again?
40, now none though sadly. (Won’t say anymore on them though, as much as I liked them as units we’ve had more than enough 365 appreciation threads!)
 

Class15

On Moderation
Joined
30 Dec 2021
Messages
1,431
Location
The North London Line
I notice your profile picture is one of the 365s which GWR were supposed to have had… how many of those were there again?
40, and the reason why GWR didn’t take them is because of electrification delays *cough cough*

40, now none though sadly (won’t say anymore, as much as I liked them as units we’ve had more than enough 365 appreciation threads!)
Fantastic units, should have been saved.
 