truckman060473
Member
Just bought one of these, built as a through station and the width between the two platforms is fixed at a distance which is set by the overhead canopy mounts. I found that running twin tracks through it, where coaches look a realistic space from the platform edge, leaves room for a third track down the centre for goods trains bypassing. The gap between rolling stock is about 1cm. As long as you are willing to use flexible track outside the station to head back to adequate loading gauge at the curves it will work.