duffield
Established Member
The Robin Hood Line faces the wrong way in respect of the South Yorkshire Joint Railway and would require a reversal at Workssop would it not?
I think it would be better if the Nottingham to Worksop services were extended to Retford to connect with the ECML services.
I don't think a reversal at Worksop for a 2 car DMU to access this line is a big deal or the main issue. But I've had a cursory look at this line and while I'm generally quite favourable towards reopenings, this looks like a rather meandering (and maybe slow and lower quality?) line which just skims the edge of a couple of smallish places, so I'm not convinced. It's easy to say 'there is an existing operational freight line so it should be cheap and simple' but it might need considerable upgrades for passenger use. Extending Robin Hood line services to Dinnington and Maltby in theory shouldn't be be too difficult but are there paths into Doncaster? And if not, do people want to travel from Maltby and Dinnington to Worksop (and then maybe change for a long way round journey to Sheffield) or would they mainly want to go to Doncaster? A lot of questions to answer. (And I'm speaking from the point of view of someone who has often thought "There's a freight line there, why no passenger services".)
Summary: I'd not dismiss this but the existing freight line isn't enough to justify it. Where do people from Maltby and Dinnington area want to go, and how many of them would use the train? Would this be a useful service for Worksop to Doncaster?