• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Lumo applies to operate Rochdale - London

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkRailFan

On Moderation
Joined
6 Sep 2023
Messages
1,444
Location
York
Every time I've got that train, nearly everyone has got off at York.
I occasionally get that train (when it's not cancelled) and yes, a lot get off at York but a lot do go to Hartlepool and Sunderland and quite a few do get on in York, especially when there's a match day in either Hartlepool or Sunderland with people coming across the Pennines and changing at York.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
5,569
Given that P1 isn't reversible and P3 isn't reachable from the south, presumably the plan will be then to reverse on the Metrolink spur?
If I'm thinking of the same spur as you (the unused one that use to be part of the Oldham Loop), it's currently out of use but I'm sure it could be brought back without too much fuss.

Different depots is a very fair point I didn't consider. Perhaps the CAF option would be a good follow-on order to LNER's order (and quite possibly TPE's 29 future trains) with the only difference being an electric-only specification with a battery pack on board. It'll be years before any possible Lumo services will be happening anyway so there's also plenty of time for things to change.
Based on nothing but pure speculation on my part, I wonder if they could be CAF sets similar to the LNER order but maintained at Newton Heath - which has a CAF presence already. I suspect there's no spare capacity there though.
 
Joined
23 Apr 2012
Messages
346
Location
Greater manchester.
Maybe they won't get all of them. But 6 will be spread out, and other OAs get other hours. It's not like hourly Blackpool is needed. And the new Liverpool will cover those TV stops well. This gets out of the way, being first stop Warrington (and that call is the likely bone of contention here!)


This is somewhat naive - I don't think this service is about Rochdale at all - a sad little dead town. It's a turnback.

If the works were done, this would be really interesting to call at Salford Central, however. Would also give a Warrington BQ connection to Central, which might be useful for many.
Rochdale is a dead town, But a town with a big catchment around it - Oldham, Bury, Bacup etc.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
12,370
If I'm thinking of the same spur as you (the unused one that use to be part of the Oldham Loop), it's currently out of use but I'm sure it could be brought back without too much fuss.
How long a train could presently be accommodated in the 'Rochdale Turnback'?
 

cle

Established Member
Joined
17 Nov 2010
Messages
4,118
Perhaps getting the service going is a first step towards somewhere else? Blackburn comes to mind.
I was thinking Stalybridge and Huddersfield.

If Salford Central works ever happened, I don't think Eccles would be worth it. But I'd be curious if it was pushed around MediaCity, or some corporate deals done, there could be uptake.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,575
Location
South Wales
I guess Hitachi are now short of future work, and if First Group / Lumo said we need X trains and would like 2 extra carriages for existing (or whatever).

Some sort of clone of class 803 or 807 for quick delivery, would be simple option, as long as the volume and price makes sense for Hitachi.
Potentially they might be much happier with a definite straightforward order from the private company than a subject to tender and lot of messy negotiations from a DfT subsidised operator.
Grand Union I heard wanted some class 805s but Hitachi were asking too much wonder if they'll try again
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,894
Location
Mold, Clwyd
I see the RMT has given the proposal a hearty welcome. ;)
Their nightmare is FirstGroup being granted more access rights on the network.
However, the RMT union said open access operators were “not fronting up the true costs” and that Avanti owner FirstGroup was “one of the worst train operating companies we have ever dealt with” and should not be given additional rights.
The RMT general secretary, Mick Lynch added: “Open access is part of a parasitic private model where operators do not pay the full costs of everything that is involved in running the service, and they are effectively cross subsidised by the taxpayer.”

North Western Trains had a go at this sort of service in the early days of privatisation (using class 158s and combining Rochdale with a Blackpool service at Newton-le-Willows).
They gave up when the true cost of running the service emerged.
Class 180s might have operated the service had it survived.
They weren't allowed to stop at main Virgin stations in that franchise era.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
12,370
North Western Trains had a go at this sort of service in the early days of privatisation (using class 158s and combining Rochdale with a Blackpool service at Newton-le-Willows).
Believe the combining and splitting location was actually at Warrington Bank Quay.

IIRC, passengers weren't allowed to board or alight there.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
16,204
Grand Union I heard wanted some class 805s but Hitachi were asking too much wonder if they'll try again
221 was their latest plan, not heard anything said about 800s. They need traction they can get their hands on now, not new builds.
 

MylesHSG

Member
Joined
3 Oct 2016
Messages
194
More grand plans, how many OAR's have applied for West Coast Mainline routes now?

They'd be better seeing what Euston and the route is looking like after Phase 1 of HS2 opens.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,647
Location
West Wiltshire
More grand plans, how many OAR's have applied for West Coast Mainline routes now?

They'd be better seeing what Euston and the route is looking like after Phase 1 of HS2 opens.

Getting paths on busy lines can often be subject to timetables so staking claim to paths now forces Network Rail and ORR to look at why they can't fit now, or when others alter services in future, explain why new operator still can't have few paths.

It is going to be much harder to get paths Litchfield - Lancashire if wait until HS2 operator has also bid for slots or changes.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
16,204
Getting paths on busy lines can often be subject to timetables so staking claim to paths now forces Network Rail and ORR to look at why they can't fit now, or when others alter services in future, explain why new operator still can't have few paths.

It is going to be much harder to get paths Litchfield - Lancashire if wait until HS2 operator has also bid for slots or changes.
HS2 will push them out the way regardless, and I also expect the rights to be time bound as well.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,647
Location
West Wiltshire
Grand Union I heard wanted some class 805s but Hitachi were asking too much wonder if they'll try again
I am guessing price is linked to volume, if just want token number then quote is likely to be high.

If two companies want versions, then rather more incentive to run the production line. And of course if going through a Rosco they could do one bigger order and lease to two or more customers.

There are potentially orders for services to Stirling, Carmarthen, Sheffield, and wouldn't rule out Lumo wanting extra vehicles to lengthen busy Scotland services. Lumo could even switch fleets between routes if trains had different capacities.

What I not sure about is if First Group, which according to corporate reports has very profitable Lumo, would order the trains anyway, and take the risk that they need an alternative home for them, rather than wait for ORR approval before ordering.
 

357

Established Member
Joined
12 Nov 2018
Messages
1,417
If two companies want versions, then rather more incentive to run the production line. And of course if going through a Rosco they could do one bigger order and lease to two or more customers.

There are potentially orders for services to Stirling, Carmarthen, Sheffield, and wouldn't rule out Lumo wanting extra vehicles to lengthen busy Scotland services. Lumo could even switch fleets between routes if trains had different capacities.
Indeed.

There's also the big question mark over the Grand Central fleet after 2027. While not part of First it's something I'd imagine a ROSCO and train builder would take into consideration if GC were looking for new trains.
 

redreni

Member
Joined
24 Sep 2010
Messages
700
Location
Slade Green
I occasionally get that train (when it's not cancelled) and yes, a lot get off at York but a lot do go to Hartlepool and Sunderland and quite a few do get on in York, especially when there's a match day in either Hartlepool or Sunderland with people coming across the Pennines and changing at York.
Right, but I'm not convinced demand for the service between Sunderland and York can justify why a very infrequent direct service to London is required (seemingly instead of, rather than as well as, local trains between Sunderland and York).

Wouldn't it be much better to have a more frequent, more regular, more predictable service from Sunderland down to York, with those who want to continue their journey from there (whether to London or not - as you say, a lot of people do want to go to places other than London) changing at York?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,894
Location
Mold, Clwyd
The Telegraph (article behind paywall, so unable to quote) seems to think the new Lumo service is to get BBC staff to Media City in Salford quicker.
The Eccles stop would be handy for the tram link to Salford Quays.
I doubt very much that potential BBC passengers entered into the Lumo planning, but you'd expect a London-based right-wing anti-levelling-up paper to pretend that it did.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,599
The Telegraph (article behind paywall, so unable to quote) seems to think the new Lumo service is to get BBC staff to Media City in Salford quicker.
The Eccles stop would be handy for the tram link to Salford Quays.
I doubt very much that potential BBC passengers entered into the Lumo planning, but you'd expect a London-based right-wing anti-levelling-up paper to pretend that it did.
Indeed, very strange article. Unsuprising for the Telegraph...
 

YorkRailFan

On Moderation
Joined
6 Sep 2023
Messages
1,444
Location
York
Right, but I'm not convinced demand for the service between Sunderland and York can justify why a very infrequent direct service to London is required (seemingly instead of, rather than as well as, local trains between Sunderland and York).

Wouldn't it be much better to have a more frequent, more regular, more predictable service from Sunderland down to York, with those who want to continue their journey from there (whether to London or not - as you say, a lot of people do want to go to places other than London) changing at York?
There is quite a lot of demand for that service. Its usually full. No one has the stock to provide a York-Sunderland service and GC only has limited paths. I doubt a York-Sunderland service would be profitable for GC, hence the extension to London to make the service worthwhile for GC.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,427
Location
The White Rose County
Given that P1 isn't reversible and P3 isn't reachable from the south, presumably the plan will be then to reverse on the Metrolink spur?

It must be.

Long term wise how about extending it all the way to Bradford and put in another platform adjacent to the run round loop ?

I was going to suggest Halifax and reinstate the 3rd platform but extending it to Bradford could potentially (if pathing allowed) a semi fast service from Bradford to Manchester.

Bradford - Halifax - Rochdale - Manchester
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
2,537
I am guessing price is linked to volume, if just want token number then quote is likely to be high.

If two companies want versions, then rather more incentive to run the production line. And of course if going through a Rosco they could do one bigger order and lease to two or more customers.

There are potentially orders for services to Stirling, Carmarthen, Sheffield, and wouldn't rule out Lumo wanting extra vehicles to lengthen busy Scotland services. Lumo could even switch fleets between routes if trains had different capacities.

What I not sure about is if First Group, which according to corporate reports has very profitable Lumo, would order the trains anyway, and take the risk that they need an alternative home for them, rather than wait for ORR approval before ordering.

First won’t be able to lease anything unless they obtain a track access agreement. The financiers and/or ROSCOs won’t sign a deal with any OA operator unless they have one.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,599
First won’t be able to lease anything unless they obtain a track access agreement. The financiers and/or ROSCOs won’t sign a deal with any OA operator unless they have one.
I'd assume a deal is 'worked out' and just needs the dotted line signing once the TAA is agreed?
 

357

Established Member
Joined
12 Nov 2018
Messages
1,417
a semi fast service from Bradford to Manchester.

Bradford - Halifax - Rochdale - Manchester
A route that already has 2 trains per hour from Leeds that take 45 minutes from Halifax to Manchester.

I'd love a faster service to Manchester but the way to do it isn't by skipping two stations that Northern call at, but by raising the linespeed and other infrastructure improvements.
 

Top