No urgency to have both routes energised by December 2014 as only enough 319s will be available for one.
--- old post above --- --- new post below ---
They will need greater pity when the rail is extended through the tunnel to Wetherby and Cross Gates as is proposed locally
I sincerely doubt that the railway line is ever going to be extended back out this way.
Too many housing developments have cropped up, and how would the line avoid the Wharfe in Collingham? There are houses dotted all along the old line on the Linton side.